
48
Section 5.3: Operation example
The following is a line-by-line short example of how turn on the beam and monitor its conditions.
Each line represents a command sent to the IBEAM. The time duration between each command
line should be a least one (1) second. For data logging operations, it is recommended requesting the
running conditions should not be performed more than once (1 time) per second. Similarly, setting
new target conditions should be limited to once (1 time) per second. If faster response in turning
the beam on/off is required, please examine the description on remote switches later in this chapter.
Line
Command
Description
1
A<cr>
Put the IBEAM in remote mode
2
BV1250<cr>
Set the beam voltage to 1250 V.
3
BI100<cr>
Set the beam current to 100 mA.
4
CI3.5<cr>
Set cathode current to 3.5 A.
5
S1<cr>
Turn the source on.
6
delay
Wait about 10 minutes before turning on the beam.
7
B1<cr>
Turn the beam on.
8
RC<cr>
Request running conditions.
9
delay
Wait at least 1 second before sending next command.
10
loop to line 8
Data log beam conditions until event occurs.
11
B0<cr>
Turn beam off.
12
S0<cr>
Turn source off.