
User’s Manual of GS-4210-16T2S_24T2S_16P2S_24P2S_48T4S
36
Figure 2-1-16:
Mounting Managed Switch in a Rack
Step 6:
Proceed with Steps 4 and 5 of session 2.2.1 Desktop Installation to connect the network cabling and supply power to the
Managed Switch.
2.2.3 Installing the SFP transceiver
The sections describe how to insert an SFP transceiver into an SFP slot. The SFP transceivers are hot-pluggable and
hot-swappable. You can plug in and out the transceiver to/from any SFP port without having to power down the Managed Switch,
as the
Figure 2-1-17
shows.
Figure 2-1-17:
Plug In the SFP Transceiver