that the centre axis of the mounting collar is plumb, and the light is balanced.
NOTE:
If ceiling tube is the pre-welded type, please go to section 4.1.5
4.1.2 DETERMINE THE CEILING TUBE LENGTH
Fig. 4.0
4.1.3 CUT CEILING TUBE TO LENGTH
!
WARNING
Do not cut tube end with countersunk holes
Fig. 5.0
4. Cut ceiling tube to length, based on the table in Fig. 4.0
5. Measure, and drill 10mm through-hole for the locking bolt, as shown in Fig. 5.0.
Содержание Phantom
Страница 1: ...PHANTOM INSTALLATION MANUAL ...