10
MEP-7000
1
2
3
4
A
B
C
D
E
F
1
2
3
4
Tie the D-OUT cables
with the PCB binder.
Pass the D-OUT cables through the
clamp that has been attached to
the board.
Fix the D-OUT cables with the
Lockin
g
Mini Clamp
that has been inserted in
the hole of the board.
Tie the cables for
analog signals
with the PCB binder
located on the left.
Tie the cables for
analog signals
with the PCB binder
located on the left.
Tie the cables for
analog signals
with the PCB binder
located on the
ri
g
ht.
Add the Shield Sheet
and FFC
g
uard.
Add the Shield Sheet
and FFC
g
uard.
: Initial dressin
g
(for the DWX2710 and DWX2
8
96)
: Temporary dressin
g
(for the DWX2
8
96)
: Permanent dressin
g
(for the DWX2
8
96)
[3] Differences in Cable Dressin
g
States
Notes
1: Before replacing the Assy, be sure to check the current cable dressing.
2: Depending on the dressing state, some additional parts may be required:
If the previous board is in the initial cable dressin
g
state:
FFC guard (DEC25
8
6), Shield Sheet (DEC3151) and Locking Mini Clamp (DEC2439)
If the previous board is in the temporary cable dressin
g
state:
Locking Mini Clamp (DEC2439)
If the previous board is in the permanent cable dressin
g
state:
N
o additional parts needed
3: Permanent cable dressing is possible with the Assy for service.