Test operation
102
Installation
11 Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
The indoor unit and outdoor unit are installed properly.
Tubing and wiring are correctly completed.
The refrigerant pipe system is leakage-checked.
The drainage is unimpeded.
The ground wiring is connected correctly.
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
The power voltage fits the rated voltage of the air conditioner.
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
The gas-side and liquid-side stop values are both opened.
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
Whether the switch on the remote controller works well.
Whether the buttons on the remote controller works well.
Whether the air flow louver moves normally.
Whether the room temperature is adjusted well.
Whether the indicator lights normally.
Whether the temporary buttons works well.
Whether the drainage is normal.
Whether there is vibration or abnormal noise during operation.
Outdoor unit
Whether there is vibration or abnormal noise during operation.
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
Whether any of the refrigerant is leaked.
Содержание LISAS-B-1403
Страница 10: ...Features 12K 18K 8 Indoor Units ...
Страница 15: ...Features 24K 36K Indoor Units 13 ...
Страница 18: ...Service Space 16 Indoor Units 4 Service Space ...
Страница 31: ...Wiring Diagrams Indoor Units 29 ...
Страница 45: ...Service Space Indoor Units 43 3 Service Space 12K 18K C Ý 3 5mm Ý 3 5mm Ý 35mm Ý 1000mm 24K 48K ...
Страница 46: ...Wiring Diagrams 44 Indoor Units 4 Wiring Diagrams UB012GMFI16MLD UB018GMFI16MLD ...
Страница 47: ...Wiring Diagrams Indoor Units 45 UB024GMFI16MLD UB036GMFI16MLD UB048GMFI16MLD ...
Страница 52: ......
Страница 55: ...Dimensions Indoor Units 53 2 Dimensions 16 Drain pipe 195 Hanging arm Unit mm 700 600 210 ...
Страница 56: ...Service Space 54 Indoor Units 3 Service Space ...
Страница 57: ...Wiring Diagrams Indoor Units 55 4 Wiring Diagrams FB012GMFI16MLD ...
Страница 61: ...Field Wiring Indoor Units 59 9 Field Wiring MFAU 12HRFN1 M ...
Страница 64: ...Dimensions 62 Outdoor Units Model Unit mm A B C D E F H YN048GMFI16RUD 938 634 404 448 370 392 1369 ...
Страница 67: ...Wiring Diagrams Outdoor Units 65 4 Wiring Diagrams YN012GMFI16RUD YN018GMFI16RUD ...
Страница 68: ...Wiring Diagrams 66 Outdoor Units YN024GMFI16RUD ...
Страница 69: ...Wiring Diagrams Outdoor Units 67 YN036GMFI16RUD YN048GMFI16RUD ...
Страница 125: ...Troubleshooting Electrical Control System 123 2 4 1 2 Outdoor unit malfunction ...
Страница 130: ...Troubleshooting 128 Electrical Control System 2 4 4 For the outdoor unit 2 4 4 2 E0 malfunction ...
Страница 131: ...Troubleshooting Electrical Control System 129 2 4 4 3 E2 malfunction Only for 12 18K ...
Страница 132: ...Troubleshooting 130 Electrical Control System 2 4 4 4 E2 malfunction For 24 48K ...
Страница 133: ...Troubleshooting Electrical Control System 131 2 4 4 5 E3 malfunction ...
Страница 134: ...Troubleshooting 132 Electrical Control System 2 4 4 6 E4 malfunction ...
Страница 136: ...Troubleshooting 134 Electrical Control System 2 4 4 8 E6 malfunction Only for 36K 48K ...
Страница 138: ...Troubleshooting 136 Electrical Control System 2 4 4 10 P1 malfunction Only for 36K 48K ...
Страница 139: ...Troubleshooting Electrical Control System 137 2 4 4 11 P2 malfunction Only for 36K 48K ...
Страница 140: ...Troubleshooting 138 Electrical Control System 2 4 4 12 P3 malfunction ...