39
Legend
:
I0
Input OSSD
I1
Input OSSD
I2
Signal input
Teaching in the actuator
Any Pilz actuator PSEN cs1.1) is detected as soon as it is brought into the response range.
Installation
CAUTION!
The unit's properties may be affected if installed in an environment contain-
ing electrically or magnetically conductive material. Please check the oper-
ating distances and the assured release distance.
}
The safety switch and actuator should be installed opposite each other in parallel.
}
Safety switches and actuators should be permanently secured using M5 safety screws
with a flat head (e.g. M5 cheese-head or pan head screws).
}
Protect the actuator from contamination.
}
Torque setting: Please note the information provided under
Technical details [
43]
.
}
The distance between two safety switches must be maintained (see
Technical
details [
43]
).
}
Make sure that the safety switch and actuator cannot be used as an end stop.
Installation example:
The full face of the safety switch is installed on the subplate.
As a result, the edges of the safety switch base are protected from shock.
PSEN cs1.13p ATEX
Operating Manual PSEN cs1.13p ATEX
21097-2EN-13