Table 2 Master Maintenance Plan Task List
Task number
Item Name
Task Description
Interval
Data Module Refer-
ence
06-00/592
Access panel, en-
gine: 42AT
Remove and exam-
ine
300 FH
06-00/593
Access panel, en-
gine: 42AT
Install
300 FH
06-00/594
Access panels, fuse-
lage: 11BL , 21PZ
Remove and exam-
ine
300 FH / 12 Months
06-00/595
Access panels, fuse-
lage: 11BL , 21PZ
Install
300 FH / 12 Months
06-00/596
Access panels, em-
pennage: 31AB,
32AB, 33ET
Open or remove. Ex-
amine
300 FH / 12 Months
06-00/597
Access panels, em-
pennage: 31AB,
32AB, 33ET
Close or install
300 FH / 12 Months
06-00/598
Access panels, en-
gine: 42AT, 42AB
Remove and exam-
ine
300 FH / 12 Months
06-00/599
Access panels, en-
gine: 42AT, 42AB
Install
300 FH / 12 Months
06-00/602
Access panels, en-
gine: 42AT, 42AB
Remove and exam-
ine
600 FH
06-00/603
Access panels, en-
gine: 42AT, 42AB
Install
600 FH
06-00/604
Access panels, fuse-
lage: 11AL, 12EL,
12QZ
Remove and exam-
ine
600 FH / 12 Months
06-00/605
Access panels, fuse-
lage: 11AL, 12EL,
12QZ
Install
600 FH / 12 Months
06-00/606
Access panels, wing:
52NB, 52OB, 62NB,
62OB
Remove and exam-
ine
600 FH / 12 Months
06-00/607
Access panels, wing:
52NB, 52OB, 62NB,
62OB
Install
600 FH / 12 Months
06-00/608
Access panels, fuse-
lage: 11AL, 11AR,
11BR, 11BL, 11BZ,
11DZ, 12AL, 12AR,
12AB, 12AZ, 12BL,
12BR, 12BZ, 12CZ,
12DZ, 12EL, 12EZ,
12FZ, 12GZ, 12HZ,
12IZ, 12JZ, 12KZ,
12LZ, 12MZ, 21GZ,
21HZ, 21JZ, 21QZ,
22PZ, 22TZ, 22UZ
Open or remove. Ex-
amine and make sure
the access panel
drain holes are clear
1,200 FH / 12 Months 12-B-06-20-00-00A-
PC-12/47E AMM Doc No 02300, ISSUE 01 REVISION 27 MSN 545, 1001-1719, 1721-1942
12-B-AM-00-00-00-I
UNCLASSIFIED
Effectivity: All
12-B-05-40-00-00A-000B-A
UNCLASSIFIED
07.02.2022 Page 11