Owner’s Manual
PO-3-20S 41 Revision 0
4.2
Technician maintenance
4.2.1
Schedule
RE
FE
RE
N
CE
IT IS VERY IMPORTANT TO DISCONNECT THE
POWER SUPPLY
BEFORE SERVICING AND
MAINTENANCE
6
M
O
N
T
H
S
12
M
O
N
T
H
S
36
M
O
N
T
H
S
1
Lubricate the #35, the #40 chains and the grease
point.
*
2
Inspect the main chain conveyor for any wear.
*
3
Inspect and changed in damaged fuses
*
4
Inspect and tighten if needed the elements
connections and the overall wiring.
*
5
Verify the current in the ceramic and tubular elements. *
6
Verify the temperature difference between the bottom
elements temperature setting and reading.
*
7
Inspect the 18 ceramics element for cracks, replace if
needed.
*
8
Inspect the small conveyor(s) and tighten the flat flex
belt if needed.
*
9
Inspect the elongation of the #35 and #40 chains
*
10
Check the sprocket for proper chain alignment and
wear.
*
11
Verify the main conveyor spring elongation.
*
12
Change the main conveyor rollers.
*
Содержание PO-3-20S
Страница 12: ...Owner s Manual PO 3 20S 12 Revision 0...
Страница 13: ...Owner s Manual PO 3 20S 13 Revision 0 2 1 2With conveyor...
Страница 14: ...Owner s Manual PO 3 20S 14 Revision 0...
Страница 51: ...Owner s Manual PO 3 20S Revision 0 APPENDICES...
Страница 52: ...Owner s Manual PO 3 20S Revision 0 5 3 Limited warranty and sales conditions...
Страница 53: ...Owner s Manual PO 3 20S Revision 0...
Страница 54: ...Owner s Manual PO 3 20S Revision 0 5 4 Electrical drawings...
Страница 55: ...Owner s Manual PO 3 20S Revision 0 5 5 Mechanical drawings Plan de montage...