Owner’s Manual
PO-3-20S 15 Revision 0
2.2
Installation requirements
Improper installation, adjustments, alteration, service
or maintenance could result in property damage,
injury or even death.
Prior to the installation, you should make sure that:
You have a clear way in your building to the desired location that
respects the overall dimensions of your model as shown in
section 2.1.
The oven is not fully enclosed and there is a venting hood.
A qualified technician will be in charge of the installation and first
start up.
The connections required to start the oven are already in place
(see section 2.32.3)
The cable must be protected by a seal tight conduit, and must be
an ultra-flexible rated for 208-220V/60A/3PH/60Hz.
Minimal distances must be respected (see table below)
For additional details, refer to our Installation and Start-up guide.
Table 2. Minimal distances between combustible and non-combustible
material
MINIMAL DISTANCES
Oven sides
2 inches of clearance
Oven floor
0 inch of clearance
Oven exit (no conveyor model)
6 inches to let the pita out of the oven
Содержание PO-3-20S
Страница 12: ...Owner s Manual PO 3 20S 12 Revision 0...
Страница 13: ...Owner s Manual PO 3 20S 13 Revision 0 2 1 2With conveyor...
Страница 14: ...Owner s Manual PO 3 20S 14 Revision 0...
Страница 51: ...Owner s Manual PO 3 20S Revision 0 APPENDICES...
Страница 52: ...Owner s Manual PO 3 20S Revision 0 5 3 Limited warranty and sales conditions...
Страница 53: ...Owner s Manual PO 3 20S Revision 0...
Страница 54: ...Owner s Manual PO 3 20S Revision 0 5 4 Electrical drawings...
Страница 55: ...Owner s Manual PO 3 20S Revision 0 5 5 Mechanical drawings Plan de montage...