![PI L-505.02A212F Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/pi/l-505-02a212f/l-505-02a212f_user-manual_1554409025.webp)
8
Maintenance
NOTICE
Damage due to improper maintenance!
Improper maintenance can lead to misalignment and failure of the L-505.02A212F.
►
Loosen screws only according to the instructions in this manual or the instructions of our
customer service department (p. 30)
.
8.1
Maintenance Run
The maintenance run serves to distribute the existing lubricant.
The following intervals for the maintenance run depend on the operating conditions and the
period of use:
■
After 500 operating hours or at least after one 1 year
■
If the L-505.02A212F is moved over a small travel range (<20 % of the entire travel range)
during industrial operation: After every 2000 motion cycles
Performing a Maintenance Run
1. Make sure that collisions between the L-505.02A212F, the load to be moved, and the
surroundings are not possible over the entire travel range of the L-505.02A212F. If
necessary, remove the load from the motion platform of the L-505.02A212F for the
maintenance run.
2. Perform a maintenance run over the entire travel range:
a) Command the L-505.02A212F to the end of a travel range and from there to the
opposite end of the travel range (see manual for the electronics).
b) If necessary: Command the L-505.02A212F to a position, where the load can be
mounted onto the motion platform again and
mount the load back onto the
L-505.02A212F (p. 20)
.
8.2
Relubricating
Overview
1
2
1
1. Guides
8 MAINTENANCE
L505M0020EN
‒
10/22/2018
25
M O T I O N | P O S I T I O N I N G