Phoenix 4400- DHP
November 2017
9
8f. Using the side frames set aside earlier, assemble the stand with the cross members. Refer
to the Packing List, Section 7, for the proper hardware.
8g. Lift the machine off the skid and set it on the assembled stand, securing it with
the locking thumbscrews on both side frames. The locking castors go to the front.
Refer to the Packing List, Section 7, for the proper hardware.
NOTE: The machine is heavy; use caution and good lifting practices when moving
the machine to the stand.
Locking thumb screws
1
2
3
1.
Fastening bolts
2.
Side frames
3.
Cross members