Installation
3886_en_A
PHOENIX CONTACT
9
2
Installation
2.1
Safety regulations and installation notes
Installation, operation, and maintenance may be carried out only by qualified electricians.
Follow the specified installation instructions. The applicable specifications and safety
directives (including the national safety directives), as well as the general technical
regulations, must be observed during installation and operation. The technical data should
be taken from the packaging instructions and the certificates (conformity assessment, other
possible approvals).
Opening the device or making changes to it is not permitted. Do not repair the device
yourself, but replace it with an equivalent device. Repairs may be carried out only by the
manufacturer. The manufacturer is not liable for any damage caused by violation of the
prescribed regulations.
The IP20 degree of protection (EN 60529) of the device is intended for a clean and dry
environment.
Do not subject the device to any load that exceeds the prescribed limits.
The device is not designed for use in environments with danger of dust explosions.
2.2
Mounting
To mount on the DIN rail:
1.
Place the device onto the DIN rail from above (A), so that the upper housing keyway
hooks onto the top edge of the DIN rail.
2.
Hold the device by the housing cover and carefully push the device toward the
mounting surface (B).
3.
After the foot is snapped onto the DIN rail, verify that it is attached securely.
Figure 2-1
DIN rail mounting
A
B
Содержание 1020882
Страница 1: ...User manual Protocol converter for ASCII to PROFINET...
Страница 10: ...GW PN ASCII 8 PHOENIX CONTACT 3886_en_A...
Страница 42: ...GW PN ASCII 40 PHOENIX CONTACT 3886_en_A...
Страница 46: ...GW PN ASCII 44 PHOENIX CONTACT 3886_en_A...
Страница 50: ...GW PN ASCII 48 PHOENIX CONTACT 3886_en_A...