Philips UrbanSpark Скачать руководство пользователя страница 2

Important Safety Notice

The  battery  presents  a  risk  of  electrical  shock  and  a  high  short  circuit  current.  The 

Signify mounting instructions must be strictly followed, otherwise potential application, 
reliability,  or  safety  issues  may  arise.  Contact  your  local  Signify  service  if  the 
instructions cannot meet special field conditions.

Only a qualified  Sig nify service representative who is knowledgeable in batteries and 

the  required  precautions  is  permitted  to  service  the  battery.  Keep  unauthorized 
personnel away from batteries.

Danger:

1. The battery package maybe explode by shock, please be careful during handling. 
2.  When moving batteries. Wear all appropriate safety clothing and equipment.
3.  Prohibit dispose of the batteries in a fire. The batteries could explode.

Caution:

1. The misuse of this equipment could result in human injury and/or equipment damage. 

In  no  event  will  S i g n i f y   be  responsible  or  liable  for  either  indirect  or  consequential 
damage or injury that may have resulted from the misuse of this equipment. 

2.  Use tools with insulated handles to avoid inadvertent shorts.
3.  Verify circuit polarities before connecting.
4.  Connect  sequence:  a)  connect 

load

,;  b)  connect 

battery

;  c)  connect 

charging 

source (PV)

.

5.  Disconnect  sequence:  a)  disconnect 

charging  source  (PV)

;  b)  disconnect 

battery

c) disconnect 

load

.

Warning:

1.  Failure  to  replace  a  battery  before  it  becomes  exhausted  may  cause  the  case  to 

crack,  possibly  releasing  electrolytes  from  battery  and  resulting  in  secondary  issues 
such as odor, smoke, and fire. 

2. The battery system must be in proper maintenance according to the  "

Maintenance

manual in this book. This is essential for safety and the reliability of the lighting system. 

3. Do not  dispose of  batteries except  through channels in  accordance with local, state 

and federal regulations.

4.  Positive  and  negative  connectors  of  PV  panel  and  battery  are  properly  connected 

with charge controller. 

Don

’t connect the battery positive to PV panel positive and 

vice versa.

Notice: The mounting instructions in this document is for standard solar lighting system 

installation. It is vitally important that you observe the precautions recommended in this 
manual.

2

Содержание UrbanSpark

Страница 1: ...UrbanSpark Mounting Instructions V3 1 1 ...

Страница 2: ...e resulted from the misuse of this equipment 2 Use tools with insulated handles to avoid inadvertent shorts 3 Verify circuit polarities before connecting 4 Connect sequence a connect load b connect battery c connect charging source PV 5 Disconnect sequence a disconnect charging source PV b disconnect battery c disconnect load Warning 1 Failure to replace a battery before it becomes exhausted may c...

Страница 3: ...can not avoid the shade you must ensure the shade below the 2m of the pole If you do want to install the system at a shade area please consult to Signify professional people 2m 2m unit mm M20 nuts Advise material SUS Spring Washers Advise material SUS Spring Washers Advise material SUS All the pictures in the MI sheet are representative only and may vary from the actual product 235 235 60 M 20 nut...

Страница 4: ...ry Luminaire Cross screwdriver Spanner Max open size 30mm Multimeter optional T30 6 Lobe pin drive key Part of supply Steel rope Φ1 5Mm length 8m Note Luminaire may be different according to different requirements OR All the pictures in the MI sheet are representative only and may vary from the actual product M8 Socket screw wrench Size 5 4 ...

Страница 5: ...0 400 250 Hard Block Soft cushioning M10 Screw M10 Washers 2x M10 Nut M10 Lock Nut M10 Screw M10 Washers 2x M10 Nut M10 Lock Nut 3 Open the service hatch door using the T30 6 Lobe pin drive key provided along with the PV Cartridge 5 4m Pole Assembly 1 Insert the PV cartridge to the pole as shown Pass the cartridge cable through the cutout provided and then pull the same using steel rope from servi...

Страница 6: ...embly OR 1 Insert the PV cartridge bottom first and pass the cable through the cutout given and then pull the same using steel rope from service hatch 3 Unscrew M8 screws and open top cover from PV Cartridge Top 8 N m 5mm 5mm torque 8 N m 5mm 5mm torque 8 N m 5mm torque Wa rni ng Wire should be pulled out properly don t let the wire to come between mating faces 2 Fix the PV Cartridge bottom using ...

Страница 7: ...driver 7b Then affix back the rubber covers X8 and rubber caps X4 8 Connect male and female MC4 T2 connectors to both PV Cartridge cables through service hatch PV Cartridge Top PV Cartridge Bottom MC4 connector T2 Male MC4 connector T2 Female 2 5 N m P1 torque 2 5 N m P1 torque 4 Connect both MC4 connectors of PV cartridge top cable to the 4m long MC4 extension cable then Insert the PV cartridge t...

Страница 8: ... the pictures in the MI sheet are representative only and may vary from the actual product Affix the pole by M20 Nuts spring washers and flat washers Affix the pole For both 4m and 6m 8 6 Luminaire Assembly for both 4m and 6m Pull the luminaire cable using steel rope from service hatch and tighten screws to affix the luminaire Note Refer luminaire mounting instruction sheet for luminaire fixing gu...

Страница 9: ... Note 1 Configure the charge controller as per customer requirement For more details contact Signify Local sales Service representative 2 Positive and negative connectors of PV panel and battery are properly connected with charge controller Don t connect the battery positive to PV panel positive and vice versa Indicators LED Blinking 1 Sec ON off Green Orange As per design Normal Charging LED Blin...

Страница 10: ...ation dimensions follow the MI yes No 4 Products If all components no damaged yes No 5 Bolts If four bolts are fixed yes No 6 Wiring If the wiring is done as per the instruction yes No 7 Fixing of PV Cartridge with Pole If all the screws are are properly tightened and rubber bolt cover are placed over yes No 8 Work status If the work status comply to the request yes No 9 Luminaire If the luminaire...

Страница 11: ... incorrect Reconfigure the charge controller Battery capacity is low Wait for several sun days for recovering battery or recharge the battery by charger Luminaire power is high Reconfigure the charge controller Part or all PV panel disconnection Connect all PV panel Dimming mode Reconfigure the charge controller RTE work mode enable Reconfigure the charge controller Power less than specifications ...

Страница 12: ...ry performance do not exceed storage time as following definition Under 20 25 six months Under 20 35 three months Under 20 45 one month Warning 1 The recycle of the used battery should strictly follow the local laws and regulations It is forbidden to handle the battery as normal garbage for disposal 2 Do not open short circuit or mutilate batteries as injury may occur 3 Do not put the battery into...

Страница 13: ...e the charge controller as per customer requirement For more details contact Signify Local sales Service representative 2 Positive and negative connectors of PV panel and battery are properly connected with charge controller Don t connect the battery positive to PV panel positive and vice versa Indicators LED Blinking 1 Sec ON off Green Orange As per design Normal Charging LED Blinking 0 5 Sec ON ...

Отзывы: