
NOTE
If remove the eye bolts on the top of the cabinet, must assemble the water-
proof plastic bolts(in the accessory pack).
STEP 1.
3.5.3 Installing the AC Input Connection
Open Right Cover for Wiring: Connect L1, L2, L3 and N of AC power to 4P termi-
nal. Fasten each wire with proper screw and torque number- 120Kgf.cm/5-15
secs. Connect the PE wire (green with yellow) to grounding position of charger
and torque number- 60Kgf.cm.
L1
L2
L3
N
PE
16
Содержание DC EVSE 60KW
Страница 2: ......
Страница 10: ...2 5 Direction of cooling Airflow Air Out Air In 7 ...
Страница 15: ...Remove these 4 pcs of fixing M12 screws STEP 3 12 ...
Страница 55: ...52 NOTE ...
Страница 56: ...NOTE ...
Страница 57: ...NOTE ...
Страница 58: ...Manufacturer Contact Info Sticker www phihong com tw ...