PFT G 5 c FU 230V
Operating Manual
Issued: 09.2007
Knauf PFT GmbH & Co. KG
21
Warning:
The protective grille should not be removed during operation or while preparing the
machine.
Press water flow button (1) (water pump runs), adjust estimated water quantity at the
needle valve (2).
Connect the water hose of the water flow meter to the upper water inlet of the mixing tube.
Press the water flow button briefly. When starting the machine, there must be a
sufficient amount of water in the mixing area so that the rotor head is covered (check
for leaks, screw pump might be defective).
Check the water level (with pump motor tilted).
WARNING!
If the 7-pin connection plug of the mixer pump motor is removed, the control circuit is
interrupted (starting lock). To put the machine back into service, the green ON switch
must be used again.
Star wheel selector switch
Position “1”
Star wheel runs in synchronization with the mixer pump and is switched on and off using
the air control or remote control.
1
2
Содержание G 5 c FU
Страница 50: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 50 Circuit diagram...
Страница 51: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 51 Circuit diagram...
Страница 53: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 53...
Страница 55: ...PFT G 5 c FU 230V Operating Manual Issued 09 2007 Knauf PFT GmbH Co KG 55...