![PFT 00 24 88 94 Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/pft/00-24-88-94/00-24-88-94_operating-manual_1535685046.webp)
CAYMAN Part 2 Overview – Operation - Spare parts lists
End of work / clean machine
46
2017-03-22
37 End of work / clean machine
37.1 Secure against restarting
DANGER!
Danger to life from unauthorised restarting!
When working with the machine there is the risk
that the energy supply is switched on without
authorisation. This poses a danger to life for the
persons in danger area.
– Switch off all energy supplies before starting
any work and secure against restarting.
37.2 Empty the machine FU Machine:
Fig.
63: Run the machine empty
The machine has to be cleaned daily.
In addition, before end of work:
1. Turn the selector switch (1) to position “6” (empty the mixer).
2. The mixer conveys material in the pump container till the pilot
lamp “No Material” lights up.
3. The machine switches off on its own.
NOTE!
Never let the pump run dry as this reduces the
service life of the pump.
37.3 Disconnect the mortar hoses
1
Fig. 64: Mortar pressure to "0” bar.
1. Check the mortar pressure gauge if the mortar pressure has
lowered to "0" bar.
2. Change the direction of rotation of the pump motor is required.
See chapter 22.1
DANGER!
Overpressure on the machine!
When opening machine parts they can open in an
uncontrolled manner and injure the operator.
Therefore:
– Open the mortar hoses only when the pressure
has dropped to "0" bar.
3. Loosen the cam lever (1) and disconnect the mortar hose from
the pressure flange.
1
Содержание 00 24 88 94
Страница 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Страница 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Страница 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Страница 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Страница 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Страница 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Страница 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Страница 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Страница 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Страница 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Страница 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Страница 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Страница 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...