2017-03-22
18.3 Transport inspection
On receipt check the delivery immediately for completeness and
transport damage.
In case of externally visible transport damage, proceed as follows:
Do not accept the delivery or under reserve only.
Note the extent of damage on the transport documentation or
on the delivery note of the carrier.
Initiate complaint process.
NOTE!
Report any defect as soon as it is detected. Claims
for damages can be asserted only within the valid
warranty period.
18.4 Transport
Fig. 18: Truck transport
Truck transport:
1. Pay attention that the turning bolts (1) for securing the pump
are engaged
2. Lock the castors (2).
3. Secure lose parts, or remove them.
4. The material container of the mixer must be completely empty
and clean.
5. Check whether all supply lines and hoses are decoupled.
6. Lock control box doors of CADDY.
Anchor points
Fig. 19: Crane transport
Crane transport:
Anchor the machine at the crane lugs (3) with straps for transport
by crane.
Observe the following conditions:
The crane and lifting equipment have to be designed for the
weight of the packages.
The operator has to be authorised to operate the crane.
Attachment:
Attach ropes or straps accordingly.
Ensure that the package is straight, possibly observe
eccentric centre of gravity.
3
1 2
2
Содержание 00 24 88 94
Страница 83: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 83 ...
Страница 84: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 84 2017 03 22 ...
Страница 85: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 85 ...
Страница 86: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 86 2017 03 22 ...
Страница 87: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 87 ...
Страница 88: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 88 2017 03 22 ...
Страница 89: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 89 ...
Страница 90: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 90 2017 03 22 ...
Страница 91: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 91 ...
Страница 93: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 93 ...
Страница 94: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 94 2017 03 22 ...
Страница 95: ...CAYMAN Part 2 Overview Operation Spare parts lists Circuit diagrams 2017 03 22 95 ...
Страница 99: ...CAYMAN Part 2 Overview Operation Spare parts lists 2017 03 22 99 ...