background image

5

3.2. Laying The Exhaust Line

Please observe the backing pump operating

instructions when laying the exhaust line.
Exhausted gases and vapours can be hazardous
to health and cause environmental pollution.

3.3. Venting Units

The pumping stations are equipped with Venting valve 
TVF 005 as standard.
Control is effected via the pre-selected setting on Electronic
Drive Unit TC 600.
The venting mode of the TVF 005 is selected via the DCU.

Drying Unit TTV 001 (Accessory)

The drying unit keeps moisture away from the apparatus
when venting with atmospheric air.

Secure Drying Unit TTV 001 to the rear side of the pumping
station casing using the two knurled screws. 
Where the casing variant with additional cover for the
rotary vane vacuum pump is involved the drying unit must
be fitted within this cover.

Make the connection to the venting valve with a PVC hose
(please refer to Section 9. Accessories).

CAUTION

3.1. Preparations For Installation

Do not carry out any unauthorised conversions
or alterations to the turbo pumping station.

– Only remove the blank flange from the high vacuum side

immediately before connection.

– The lubricant reservoir is already fitted to turbopumps and

filled.

– Where the use of rotary vane vacuum pumps is involved,

the operating fluid is included in the delivery consignment
and must be filled into the pump before first time operating.

– Diaphragm pumps do not require lubricant.
– Permissible magnetic fields:

TSH 071/TSU 071 

4 mT

TSH 261/TSU 261 

5.5 mT

TSH 521/TSU 521 

5 mT

– The pumping station should be erected on a horizontal 

surface.

On delivery, the pumping station is provided with four elastic
buffers on the underside.
In addition, and to render the pumping station mobile, rollers
can be fitted (please see Section 9. Accessories).

WARNING

3. Installation 

2.3. Pumping Station Components

P

Pu

um

mp

piin

ng

g  S

Stta

attiio

on

n

T

TS

SH

H  007711

T

TS

SH

H  226611

T

TS

SH

H  552211

O

Op

pe

erra

attiin

ng

g  IIn

nssttrru

uc

cttiio

on

nss

T

TS

SU

U  007711

T

TS

SU

U  226611

T

TS

SU

U  552211

C

Co

om

mp

po

on

ne

en

nttss

T

Tu

urrb

bo

om

mo

olle

ec

cu

ulla

arr  D

Drra

ag

g  P

Pu

um

mp

p

TMH 071

PM 0504 BN

TMU 071

TMH 261

PM 0470 BN

TMU 261

TMH 521

PM 0496 BN

TMU 521

D

Diia

ap

ph

hrra

ag

gm

m  P

Pu

um

mp

p

MVP 015-2

PU 0012 BN

MVP 035-2

MVP 035-2

PU 0011 BN

MVP 055-3

MVP 055-3

MVP 055-3

PU 0011 BN

R

Ro

otta

arryy  V

Va

an

ne

e  V

Va

ac

cu

uu

um

m  P

Pu

um

mp

p

DUO 2.5

DUO 2.5

DUO 2.5

PK 0152 BN

UNO 005 A

UNO 005 A

UNO 005 A

PK 0152 BN

DUO 5

DUO 5

DUO 5

PK 0197 BN

DUO 10

DUO 10

DUO 10

PK 0170 BN

V

Ve

en

nttiin

ng

g  V

Va

allvve

e

TVF 005

TVF 005

TVF 005

PM 0 507 BN

For further accessories please refer to Section 9.

Содержание TSH 071

Страница 1: ...Turbomolecular Drag Pumping Stations PT 0031 BE H 0408 TSH 071 TSU 071 TSH 261 TSU 261 TSH 521 TSU 521 Betriebsanleitung Operating Instructions...

Страница 2: ...l Schema 7 Connection Involving Rotary Vane Vacuum Pumps 8 Connection Involving Diaphragm Pumps 9 4 Operations 10 4 1 Transportation Protection 10 42 Filling In The Lubricant 10 4 3 Operational Behavi...

Страница 3: ...tomatically following an interruption to the mains power supply For this reason access to the vacuum chambers for example via doors flanges valves may only be opened once the pumping station has been...

Страница 4: ...ry vane vacuum pump must be filled with operating fluid The operating fluid is contained in a pack inclu ded with the delivery consignment Before first time starting on pumping stations equipped with...

Страница 5: ...operating fluid is included in the delivery consignment and must be filled into the pump before first time operating Diaphragm pumps do not require lubricant Permissible magnetic fields TSH 071 TSU 07...

Страница 6: ...of accessories please refer to Section 3 7 Connections Plan 3 5 Connecting The Vacuum Unit There should be no unilateral loading on the high vacuum flange The weight of a vacuum chamber freely flange...

Страница 7: ...MEASURANCE TERMINAL STRIP X1 3 TERMINAL STRIP TSHU 071 261 521 RS 485 REMOTE VENT FAN HEAT TMS FV PUMP X2 PM 051 409 X 13 14 1S2 1X2 PE PE TC 1E5 PM 051 101 T POT EQUALIZATION FRAME GROUNDING M 1 U V...

Страница 8: ...CKING PUMP AS ROTARY VANE PUMP 21 X1 22 X1 A1 A2 1K1 12 21 14 1 2 1 2 12 21 14 1K1 1 4 K A 1 2 3 4 FV PUMP ws PM 051 409 X gn bn ge Z MAINS TURBO PE PE 18 OPTION 19 20 A1 A2 PE 1Y8 TVV 001 FORE VACUUM...

Страница 9: ...X gn bn ge Z MAINS BACKING PUMP AS DIAPHRAGM PUMP 21 X1 22 X1 240VAC 5A SOLID STATE RELAY PE TURBO PE M 1 U V PE 1E8 FAN 17 15 X1 16 X1 M 1 U V PE 1M7 BACKING PUMP 18 1G5 POWER SUPPLY 20 19 A1 A2 PE 1...

Страница 10: ...nt and type of operating fluid is shown on the rating plate Screw in operating fluid filler screw 8 and take care with the O ring Re secure the filling hose in the side panel Fit the side panel back o...

Страница 11: ...itched off with the key 6 Pumpstand EIN AUS pumping station ON OFF Turbopump and vacuum chamber are vented via Venting Valve TVF 005 which opens for 0 3 seconds when the venting frequency does not att...

Страница 12: ...right hand side Exert slight downward pressure on operating fluid duct 6 turn 90 and bring into the forward position Unscrew operating fluid drain screw 7 and drain operating fluid via operating flui...

Страница 13: ...hich are contaminated microbiologically explosively or radioactively cannot be accepted as a matter of principle Fill out the declaration of contamination In every case the Declaration of Contaminatio...

Страница 14: ...3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 Rotary Vane Pump DUO 2 5 m 3 h 2 5 2 5 2 5 2 5 2 5 2 5 2 5 2 5 2 5 UNO 5 m 3 h 5 5 5 5 5 5 5 5 5 DUO 5 m 3 h 5 5 5 5 5 5 5 5 5 DUO 10 m 3 h 10 10 10 10 10 10 10 10...

Страница 15: ...onnection Durchf hrung Me kabel Auspuff G1 2 Exhaust G1 2 Feedthrough Measurement cable Sperrgas Flutgas Sealing gas Venting gas Wasserk hlung Water cooling 3 150 145 275 96 Betriebsmittel abla rinne...

Страница 16: ...ug PM 041 903 T PM 0542 BN 208 V UL plug PM 041 904 T 115 V UL plug PM 041 905 T TMH TMU 521 230 V Schuko plug PM 051 096 T PM 0542 BN 208 V UL plug PM 051 097 T 115 V UL plug PM 051 098 T Water cooli...

Страница 17: ...he repair and or service of vacuum components will only be carried out if a correctly completed declaration has been submitted Non completion will result in delay The manufacturer could refuse to acce...

Страница 18: ...the product specified below is in accordance with the provision of EU Machinery Directive 98 37 EEC EU Electromagentic Compatibility Directive 89 336 EEC and EU Low Voltage Directive 73 23 EEC Produk...

Страница 19: ...81 3 32 259 011 Email pfeiffer hakuto co jp Korea Pfeiffer Vacuum Korea Ltd 703 Ho 853 1 Hankuk Mulru Dongchonri Suzi Eup 449 843 Yong in City Kyungkido Phone 82 31 266 0741 Fax 82 31 266 0747 Email s...

Отзывы: