3
3
5
2
1
4
1
Screws
4
Cap
2
Gas ballast valve
5
Locking screw
3
Screws
Required tools
● Allen key, 5 mm
● Allen key, 6 mm
● Open-end wrench, 14 WAF
● Open-end wrench, 19 WAF
Removing the cap
1. Drain the operating fluid
(see chapter “Draining the operating fluid”, page 39)
2. Unscrew the screws and remove the gas ballast valve.
3. Disconnect the cap and remove axially; be careful with the spring washers.
4. Clean the inside of the cap.
5. Unscrew the locking screw.
7
5
6
8
8
9
10
11
4
Fig. 18:
Installing the flushing gas pipe
Installation
29/66
Содержание DUO 35
Страница 1: ...OPERATING INSTRUCTIONS EN Original UNO 35 65 DUO 35 65 Rotary Vane Pump ...
Страница 2: ...PK0168BEN_Q PK0168 2018 01 31 ...
Страница 65: ...65 66 ...
Страница 66: ... PK0168 ed Q Date 1801 P N PK0168BEN ...