Connecting the pump/cabinet connection cable
1. Connect the female connector to the pump’s socket.
2. Lock the pump connector in place.
3. Completely unroll the cable between the pump and the cabinet.
4. Observe a minimum bend radius of 200 mm on the cable.
5. Connect the male connector to the cabinet socket.
6. Lock the cabinet connector in place.
Earthing
Users must provide a second circuit protective conductor (earth) whose cross-section is at least equal
to that of the conductors.
The IEC 60417 #5019
symbol is marked on the rear panel to indicate where the CPC earth terminal
is located.
► Connect the earth stud to a suitable installation earthing point.
Connecting to the pumping line
► See chapters “Connecting to the pumping line” and “Check that the installation is leaktight” in the
ACP 28-40 operating instructions.
Electrical connection of the cabinet
► See chapter “Electrical connection” of the ACP 28-40 operating instructions.
Connecting a remote control
► See chapters “Remote connector wiring” and “Wiring the RS-485 serial link” in the ACP 28-40 op-
erating instructions.
Installation
6/12