12 - 7
Adjustment
12
.04.04
Grinding the hot wedge
Grinding of the hot wedge is only required, if the hot wedge is deformed by
wear or corrosion, or if a new hot wedge has been installed.
●
Set heat-sealing temperature at "0".
Allow the hot wedge to cool down!
Danger of burns if the hot wedge is touched!
●
Switch the machine on.
●
Mount smooth feed rollers.
●
Set the operational mode to
Reverse.
●
Insert screw
1
as far as possible.
●
Place emery strip (grain 100) between the feed rollers and lower feed roller.
Do not place fingers between the feed rollers!
Danger of crushing if fingers are caught between the running feed rollers!
●
Swing hot wedge into position and start the feed rollers.
●
Guide the emery strip by hand and work both sides of the hot wedge, until this has been
adapted to the shape of the feed rollers, and the measurement "x" is the same at the top
and the bottom.
●
Check the setting of the hot wedge and adjust it if necessary (see
Chapter 12.04
).
Fig. 12 - 06
1
x
x
Содержание 8304-020
Страница 45: ...13 2 91 211 696 95 Part 1 Version 18 03 99 Circuit diagram general plan...
Страница 46: ...13 3 Circuit diagram general plan Version 18 03 99 91 211 696 95 Part 2...
Страница 47: ...13 4 91 211 696 95 Part 3 Version 18 03 99 Circuit diagram general plan...
Страница 48: ...13 5 Circuit diagram general plan Version 18 03 99 91 211 696 95 Part 4...
Страница 49: ...13 6 91 211 696 95 Part 5 Version 18 03 99 Circuit diagram general plan...