Setting up
9 - 1
9
Setting up
All setting-up work must only be carried out by appropriately trained
personnel!For all setting.-up work , the machine must be switched off.
9
.01
Inserting the sealing tape
9
.01.01
Adjusting the tape reel bracket to the size of the tape reel
Fig. 9 - 01
2
1
●
The tape reel bracket must be adjusted to the inner diameter of the tape reel:
For small inner diameters, turn the front disc
1
, so that the
small
disc
2
is positioned
opposite bracket
3
.
The tape reel can be fitted directly onto the bracket.
●
For large inner diameters, turn the front disc
1
,
so that the
large
disc
2
is positioned
opposite bracket
3
. Slide attachment
4
onto bracket
3
and fit the tape reel onto it.
When rolling off the reel, the sealing tape must not touch the inner wall of the
tape reel bracket.
3
4
Содержание 8304-020
Страница 45: ...13 2 91 211 696 95 Part 1 Version 18 03 99 Circuit diagram general plan...
Страница 46: ...13 3 Circuit diagram general plan Version 18 03 99 91 211 696 95 Part 2...
Страница 47: ...13 4 91 211 696 95 Part 3 Version 18 03 99 Circuit diagram general plan...
Страница 48: ...13 5 Circuit diagram general plan Version 18 03 99 91 211 696 95 Part 4...
Страница 49: ...13 6 91 211 696 95 Part 5 Version 18 03 99 Circuit diagram general plan...