
Set-up and Initial Commissioning
24
X1
X5
X4
X7
X6
X2
X3
X4/A
X23
X0
Fig. 8 - 04
8
.02
Connecting the plug-in connections and ground cable
O
Insert all plugs on the control box
2
in accordance with their designation.
O
Insert the "
motor
" into the bushing
X
1
and the bushing
X
2
.
Attention
Plugging in the connector incorrectly can damage the control unit!
O
Attach the following ground cables in order to discharge static electricity.
O
Securely attach the ground cable from the sewing head
1
to ground point
A
.
O
Securely attach the ground cable from the control point
B
to ground point
B
.
O
Securely attach the ground cable from the main switch
3
to ground point
C
.
O
Securely attach the ground cable from the stand
4
to ground point
D
O
Securely attach the ground cable from the motor cable X
1
to ground point
E
E
2
1
0
3
A
B
C
D
4
D
B