Note: in accordance with the reference standard,
the appliance must be replaced after 5
years from installation
and the replacement date indicated in the space provided on the
front of the box, as shown below (fig. 13).
!
Select the adhesive label corresponding to the month of installation (replacement) (e.g.
January = 01, October = 10), remove from the backing sheet and fix it to the appliance.
!
Select the label corresponding to the year of replacement (e.g.: Year of installation 2018 +
5 years: fix the label 2023), remove from the backing sheet and fix.
!
Record the date of installation, manufacture, replacement, installation area, contractor
stamp and signature in the spaces provided alongside.
3.i - RECORDING THE DATE OF REPLACEMENT
Months labels
replacement
Years labels replacement
Year of
installation
Replacement
Years
Year of
installation
E.g.:
with July 2018 as installation
date, attach the labels:
16
Installation date
Installation area
Contractor stamp and signature
Manufacture date
*Replacement date
ENTER THE INDICATED DATA
*after 5 years from date of installation
Fig. 13
07
2023
2020
07
sostituire entro
mese | anno
• Ensure that the detector has been connected to the mains for at least 1 minute.
• Spray test gas (not supplied) into the vents on the front panel of the appliance until the red LED
switches on and the buzzer sounds intermittently.
• Continue to spray the test gas, after around 30 seconds the relay is activated and closes the
solenoid valve (if connected).
4.i - CHECKING DETECTOR OPERATION
•
Stop spraying the gas into the detector vents and wait for a few seconds.
The appliance returns to "normal operating" status and all alarm signals are reset, the relay
is deactivated (fig. 3).
EN
2018
2019
2020
2021
2022
2023
2023
2024
2025
2026
2027
2028
2029
2030
2031
- - - -
- - - -
- - - -
01
02
03
04
05
06
07
08
09
10
11
12
2024
2025
2026
- - - -
- - - -
- - - -
• Re-arm manually the eventual solenoid valve connected to the detector.