background image

INSTALLATION ANd OPERATION INSTRUCTIONS

CUSTOm PASS-ThRU bACk bAR CAbINET — SELf CONTAINEd ANd REmOTE

Table of Contents

PreParing the Cabinet
Specifications .....................................................2,3
List of included Parts .............................................4
tools required ......................................................4
Plumbing ................................................................4
electrical ................................................................4
Uncrating and inspection .......................................4
Placing the Cabinet ...............................................4
Leveling the Cabinet ..............................................4
installing Legs  ......................................................4
installing the base Plate ........................................4
electrical Condensate evapaway Kit ....................4
refrigeration and temperature Control .................5
Cleaning the Cabinet .............................................5
Cleaning Stainless Steel .......................................5
replacement Parts ................................................6
reversing Door hinge ...........................................7
Wiring Diagram ......................................................8

8300 West good hope road  •  Milwaukee, Wi 53223  •  Phone 414-353-7060  •  Fax 414-353-7069

toll Free 800-558-5592  •  e-Mail: [email protected]  •  www.Perlick.com

mOdEL NOS.

 

PS Series

 

Pr Series

ImPORTANT INfORmATION

Fill  out  the  enclosed  warranty  card  and  mail  to  the 

Perlick  Corporation  to  register  the  warranty.  if  the 

card  is  not  returned,  the  warranty  period  will  begin 

from  the  date  the  equipment  is  shipped  from  the  

factory.

this manual has been prepared to assist you in the 

installation of your Cabinet and to acquaint you with 

its operation and maintenance.

We  dedicate  considerable  time  to  ensure  that  our 

products  provide  the  highest  level  of  customer  

satisfaction.  if  service  is  required,  your  dealer  can 

provide you with a list of qualified service agents. For 

your  own  protection,  never  return  merchandise  for 

credit without our approval.

We  thank  you  for  selecting  a  Perlick  product  and 

assure  you  of  our  continuing  interest  in  your 

satisfaction.

WARNING:  When  lifting,  the  full  weight  of  the 

cabinet must be supported. Lift from the cabinet 

base  and  not  from  the  top.  Improper  lifting  can 

result in severe damage to the cabinet.

PS Series 

PR Series

 

Form no. Z2279

rev 08.01.07

Содержание PR48

Страница 1: ...losed warranty card and mail to the Perlick Corporation to register the warranty If the card is not returned the warranty period will begin from the date the equipment is shipped from the factory This...

Страница 2: ...and copper tube evaporator epoxy coated coil Adjustable temperature control Self defrosting Pull out condensing unit for service and cleaning Compressor left standard ELECTRICAL 115V 60Hz 1 phase AC F...

Страница 3: ...nd Walls Stainless steel Includes pilasters 2 vinyl coated shelves and floor rack per door and interior lights Exterior Front back top and sides stainless steel Bottom galvanized steel Door Hinging St...

Страница 4: ...mage If damage is discovered file your claim immediately with the transportation company Perlick is not responsible for damage in transit Installing Legs Optional Attach four legs to the cabinet botto...

Страница 5: ...Turn the adjusting screw counterclockwise to the left Temperature Control OFF Turn the adjusting screw completely counter clockwise to the O position until a click is noted The condenser fan motor tur...

Страница 6: ...jumper 65051A 65051A Light bulb C15046 C15046 Light bulb guard 65099 1 65099 1 Light socket 63484 63484 Light switch 63303 63303 Lock 63762 63762 Space lock 63761 1 63761 1 Lock rail 65432 24SS or 65...

Страница 7: ...is assembled as the top left bracket Top right bracket is assembled as the bottom left bracket STEP 9 Re insert top hinge pin STEP 10 Re assemble lock rail from STEP 3 Operations to Perform on Door S...

Страница 8: ...N BOX TO CONDENSING UNIT MUST COMPLY WITH ALL LOCAL AND NATIONAL ELECTRICAL CODES CABINET JUNCTION BOX CONDENSING UNIT EVAPORATOR HOUSING GROUND WIRE JUNCTION BOX PRESSURE SWITCH FIELD INSTALLED POWER...

Отзывы: