Perle S-10GT Media Converter Installation Guide
10
LK1- Port 1 Activity
On: Fiber link present.
Blinking quickly: Fiber link present and receiving data.
Blinking slowly: The fiber link has been taken down as a result of
Smart Link Pass-Through.
Blinking one second on, 3 seconds off: the maximum specified
operating temperature within the inserted module has been
exceeded.
Off: No fiber link present.
LK2 – Port 2 Activity
On: Copper link present.
Blinking quickly: Copper link present and receiving data.
Blinking slowly: The copper link has been taken down as a result
of Smart Link Pass-Through.
Blinking one second on, 3 seconds off: the maximum specified
operating temperature within the inserted module has been
exceeded.
Off: No copper link present.
LK1 LK2 Error Codes
LK1
LK2
Meaning
Off
Off
Incompatible SFP+ or XFP
Off
On
Power Budget exceeded – XFP’s requesting more power than
specified port rating.
On
Off
SFP+ or XFP communication error – S-10GT unable to
communicate with module
On
On
Internal Error
Grounding the S-10-GT Chassis
If your installation requires additional grounding follow this
procedure.
Grounding the chassis requires the following items:
•
One grounding lug (not provided)
•
One 18-12 AWG wire (not provided)
•
Cross-head screwdriver (not provided)