background image

Template-Company 

IQ / OQ  

Template-SN 

Page 4 of 29  

Flexar Analytical / FX-10 UHPLC Pumps

 

IQ/OQ Rev. D June 2009

 

 

Protocol Documentation 

Documentation protocol may be superseded by customer SOP 

Writing Instruments 

All writing will be done with a black or blue ink pen. 

Signatures 

A  signature  of  each  party  involved  with  the  ownership,  management,  testing,  and  quality  assurance  of  each 
instrument will be required before testing will proceed and for final approval at completion. 
On any page where a written entry is made, or data is gathered by a PerkinElmer representative, that page must 
be signed and dated by the PerkinElmer representative. 
Up  to  three  signature  entries  are  provided  each  for  Customer  and  PerkinElmer  on  the  Preliminary  Report 
Approval Page and Final Approval Page. If any signature lines are unused, draw a single diagonal line filling the 
Signature area and then write initials and date next to the line. 
All signatures will be the signer’s full legal name as legibly as can be written and dated.   

Initials 

At any point when initials are to be used, they will contain at least two of the initials and include a date.    

Date 

Dates will be given in the format of DD-MMM-YYYY.  If a month or date is only one digit, a zero will be employed 
to maintain the two-digit format for each entry. 

 

Error Codes 

When an error is corrected, a single horizontal line through the error will be used.  The line will then be initialed 
and dated along with an error code from the list found in the protocol. 

Spaces 

For columns where the protocol is asking whether something has been verified, a “Yes” will be written.  If not, a 
“No”  will  be  written  and  an  explanation  will  be  stated  in  the  Comments  section.  A  check  mark  or  “N”  is 
unacceptable. “NA” may be used where the verification was not applicable.

 

Pass/Fail 

For areas where the protocol requires a “Pass/Fail”, the words “Pass” or “Fail” will be written in. If the instrument 
passes, Pass will be entered. If the instrument fails, Fail will be entered. 

Visual Inspections 

All  visual  inspections  will  be  filled  out  with  a  word  that  indicates  the  physical  condition  being  observed.  If  no 
damage is observed, use the word “None” if no damage is present. If damage is observed, write a description of 
the damage observed. This will apply to any visual inspections. 

Calibration/Expiration dates 

MM/YY format will be used to denote calibration and reagent expiration dates.  The instrument or reagent is valid 
until the last day of the month noted.  

Temperature 

All temperatures will be given in the unit of Celsius (°C) 

Blank Areas 

If there are no comments for a “Comments” section, “None” is written and the rest of the lines are left blank. 
If a section is not applicable, such as an alarm function, “NA” is sufficient

.  

Содержание FX-10 UHPLC

Страница 1: ...col Number Template Protocol Issue Date 27 May 2009 Date Tested Valid if tested within 1 year of Issue Date Recertification Period Recommended at 12 Months Recertification Due Date Release History Par...

Страница 2: ...2 3 PerkinElmer Service Engineer Training 11 1 3 Installation Qualification 11 1 4 Installation Qualification Verification 12 Part II Operational Qualification 13 2 1 Operating Procedure References 14...

Страница 3: ...d used Contact your PerkinElmer service provider for a service plan which may be purchased to extend coverage beyond warranty PerkinElmer recommends contracting regular preventive maintenance Over tim...

Страница 4: ...he two digit format for each entry Error Codes When an error is corrected a single horizontal line through the error will be used The line will then be initialed and dated along with an error code fro...

Страница 5: ...rounded up if above 5 and rounded up if fifth digit is 5 Failure Mode Responses If a test result is determined to be outside of the precision parameters set forth by manufacturer of instrument it will...

Страница 6: ...rroneous entries may exist within the document that can be corrected by client s Once an error is found 1 simply strike the erroneous word or entry with a black pen 2 enter the correct word or entry a...

Страница 7: ...plate Company have agreed to proceed with the procedures described in this document Template Company Signature Name Title Date PerkinElmer LAS Signature Name Title Date Final Approval This is to certi...

Страница 8: ...Template Company IQ OQ Template SN Page 8 of 29 Flexar Analytical FX 10 UHPLC Pumps IQ OQ Rev D June 2009 This page intentionally blank...

Страница 9: ...Template Company IQ OQ Template SN Page 9 of 29 Flexar Analytical FX 10 UHPLC Pumps IQ OQ Rev D June 2009 Part I Installation Qualification...

Страница 10: ...to respective documents for specific requirements for the location of the instrument Requirements are typically space actual size bench space and weight requirements especially if heavy environment po...

Страница 11: ...raining Certificate 1 3 Installation Qualification Verify the following list and mark as appropriate Description Verified 1 3 1 The working environment is suitable with reference to the appropriate se...

Страница 12: ...propriate instructions in the user s guide 1 3 14 Firmware verification 1 3 15 Software installed and appropriate panels displayed 1 3 16 Instrument control software installed if applicable 1 3 17 Dat...

Страница 13: ...Flexar Analytical FX 10 UHPLC Pumps IQ OQ Rev D June 2009 Part II Operational Qualification...

Страница 14: ...t covered in the OQ 2 2 2 Record the Serial Number and Calibration Date for each item of Test Equipment used 2 2 3 Record the Batch Lot Number and Expiration Date of each Standard Reagent and Solvent...

Страница 15: ...Number Pump Users Manual Not needed for testing Reference only Pump Service Manual Not needed for testing Reference only IQ OQ Certification Sticker 09934512 Test Equipment Manufacturer Model Serial N...

Страница 16: ...pumps solvent flow as measured at 1ml and 3ml per minute For the FX 10 UHPLC pumps solvent flow as measured at 0 3ml and 0 9ml per minute Compositional Accuracy For Binary Quaternary Analytical pumps...

Страница 17: ...quired to obtain the required back pressure Monitor the displayed pressure readout for 1 minute Note the observed maximum and minimum pressures Using the numbers obtained determine 1 The difference be...

Страница 18: ...opwatch or other timing device Let the pump run for 5 minutes When 5 minutes has elapsed remove the tube from above the collection vessel and insert it into the waste Weigh the collection vessel with...

Страница 19: ...from above the collection vessel and insert it into the waste Weigh the collection vessel with the water Subtract the weight of the collection vessel The remaining weight of the water should be 15 gr...

Страница 20: ...collection vessel with the water Subtract the weight of the collection vessel The remaining weight of the water should be 3 grams 0 03 g 2 97 to 3 03 g 0 3 mL min 10 min 3 g water weighs 1 gram per mL...

Страница 21: ...ther timing device Let the pump run for 10minutes When 10minutes has elapsed remove the tube from above the collection vessel and insert it into the waste Weigh the collection vessel with the water Su...

Страница 22: ...or other device length of tubing for example to create the necessary back pressure Fill reservoirs A and C if testing a quaternary model with HPLC grade water Pipette 1 0 mL of acetone into approxima...

Страница 23: ...and Quaternary Reservoirs A and B STEP TIME FLOW A water B acetone CURV AU absorbance or mV 0 5 0 5 0 100 0 0 0 1 1 0 5 0 100 0 0 0 2 3 0 5 0 0 100 0 0 AU1 3 3 0 5 0 10 90 0 0 AU2 4 3 0 5 0 49 51 0 0...

Страница 24: ...lute 5 mL min Channel A and B Solvent B 10 49 51 90 49 51 Delta Range Between 1 5 and 2 5 Channel C and D Solvent D 10 90 Comments 2 5 Operational Qualification Verification The Flexar Analytical FX 1...

Страница 25: ...Flexar Analytical FX 10 UHPLC Pump IQ OQ Rev D June 2009 Part III Appendices...

Страница 26: ...____________________ ________________________________________________________________________________ ________________________________________________________________________________ _________________...

Страница 27: ...____________________ Reasoning and Justification for Change ________________________________________________________________________________________ ___________________________________________________...

Страница 28: ...Sign and date Entries for up to 20 Attachments are available Additionally label each page of each Attachment as follows Attachment Number as per this table Page X of Y total Pages of the Attachment In...

Страница 29: ...v D June 2009 Appendix D Document History Revision Description of Change Page s Date A First release May 2009 B Corrected math in instructions and typo in results 20 May 2009 C Corrected footers All J...

Страница 30: ...Log Book Cut out the label below and insert into the spine of the Instrument System Log Book then destroy the remainder of this page as it is no longer required Instrument System Log Book Template Com...

Отзывы: