MANUAL PERIBEST I12
–
I17
–
I21
18 | 29
Comissioning
Testing prior to commissioning the pump
-
Ensure that the pump has not been damaged during transportation or storage. Immediately
report any damage to the supplier.
-
Check that the mains voltage is suitable for the motor.
-
Ensure that the hose is suitable for the fluid to be conveyed and that it is not damaged.
-
Make sure that the temperature of the liquid does not exceed the recommended temperature
range.
-
Only switch the pump on if it the front cover has been properly attached.
-
Check that the rollers are correctly fitted and fastened.
-
Check that the pump and drive has the correct level of lubricant.
-
Check that the thermal overload protection (not included in the delivery scope) corresponds
to the value specified on the motor type plate.
-
Check whether the direction of rotation is correctly adjusted.
-
Check that the optional electrical components are connected and are working properly.
-
Install a manometer in the pressure line if the back-pressure value is unknown.
-
Check the operating instructions in order to ensure that the flow values, pressures and power
consumption of the motor do not exceed the rated values.
-
Install a pressure relief valve in the pressure line in order to protect the pump in the event
that a valve is unintentionally closed off or the line is blocked in another way.
Содержание I12
Страница 1: ......
Страница 25: ...MANUAL PERIBEST I12 I17 I21 25 29 Spare parts ...