Peri UP Flex Staircase 100 with Deck UDG Скачать руководство пользователя страница 4

Overview

1

Presentational reference:

The illustrations on the front cover of these instructions 
are intended to be system representations only. The 
assembly steps presented are examples using the 
illustrated component sizes. They are also valid for 
alternative component sizes. 

Key

Pictogram │ Definition

Safety Instructions

Note

Visual check

Tip

Dimensional specifications

Dimensions are specified in mm. Other 
units of measurement (cm) are used in 
product descriptions.

Conventions

Instructions are numbered in 
sequence: 1.   2.   3.   etc.
Components are labelled with 
numbers corresponding to the 
overview drawing and are referenced 
within the text in brackets thus (1).
Multiple component numbers 
indicating alternatives are represented 
with a slash: 1 / 2 etc.

Arrows

Arrows represent an action

PERI UP Flex Staircase 100 and 125 with Deck UDG

Instructions for Assembly and Dismantling – Short lift system to SG4:15

Содержание UP Flex Staircase 100 with Deck UDG

Страница 1: ...PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling Short lift system to NASC SG4 15 Edition 01 2019...

Страница 2: ...Amendment Log Version Details Issue Date 0 First Issue Jan 2019...

Страница 3: ...ase 5 A2 Assembling the first level 7 A3 Assembling additional levels 10 A4 Assembling the top level 13 A5 Anchoring 15 A6 Dismantling 17 Application A7 Base reactions 20 Page Content PERI UP Flex Sta...

Страница 4: ...sional specifications Dimensions are specified in mm Other units of measurement cm are used in product descriptions Conventions Instructions are numbered in sequence 1 2 3 etc Components are labelled...

Страница 5: ...DI 8a End Step UAE 125 9a Industrial Deck UDG 25x100 9b Industrial Deck UDG 25x200 9c Industrial Deck UDG 25x125 for Stair Tower 125 9d Industrial Deck UDG 25x250 for Stair Tower 125 10 Node Brace UBK...

Страница 6: ...out on working areas situated above ground level The assembly and dismantling sequences describe a short lift system of work in compliance with NASC SG4 15 Preventing Falls in Scaffolding Operations 3...

Страница 7: ...o 1m above a top platform level Any Ledger connected between two uprights within a completed scaffold lift Any Ledger connected between two uprights up to 1m above a top platform level Inspecting the...

Страница 8: ...H 200 3b Ledgers UH 100 3c UJB 38 80 55 Yellow handle A Assembly and Dismantling A1 Assembling the base UJB 38 50 30 Red handle Fig A1 2 Fig A1 3 5 Fig A1 1 PERI UP Flex Staircase 100 and 125 with Dec...

Страница 9: ...rary they will be removed later Ensure all Ledgers UH are level by adjusting the Adjustable Base Plates 1 Place Steel Decks UDG 200 9b on the Ledgers UH 100 3c as an assembly aid to check squareness F...

Страница 10: ...2 11 hole 11 hole Fig A2 1 Fig A2 2 Other combinations of standards e g UVR 200 inside with UVR 300 outside are structurally acceptable but the customer must ensure safe method of erection striking Fi...

Страница 11: ...d 125 with Deck UDG Instructions for Assembly and Dismantling Short lift system to SG4 15 Remove provisional red Ledger UH 250 3a and attach Stair Stringer UA 6 and UH 200 3b Fig A2 5 Install Steel De...

Страница 12: ...last step 7 slightly out of the holder Horizontally position End Step UAE 8 on the last step 7 Fig A2 7d The upturned edges engage in the slits The End Step UAE 8 and the last step are wedged togethe...

Страница 13: ...except for the top level repeat the following steps Fig A3 1 Pre assembly Fig A3 2a PERI UP Flex Staircase 100 and 125 with Deck UDG Instructions for Assembly and Dismantling Short lift system to SG4...

Страница 14: ...cal Standards UVR 5 then securely fix all wedges at UVB level using a 500g hammer Place provisional Ledgers UH 100 3c shown in red they will be removed later Attach Horizontal Braces UBH 100 100 12b b...

Страница 15: ...emble Stair Steps repeating the detailed sequence in section A2 5 A3 7 Guardrails Attach UBK 250 200 10 as intermediate guardrails and remove temporary Ledger UH 100 3c above stairs Additional lift co...

Страница 16: ...ds UVR 5a then securely fix all wedges at UVB level using a 500g hammer Place provisional Ledger UH 100 3c shown in red it will be removed later 13 Fig A4 1 Fig A4 2 A4 2 Guardrail Move Steel Decks UD...

Страница 17: ...tailed sequence in section A2 5 A3 7 Guardrails Attach UBK 250 200 10 as intermediate guardrails and remove temporary Ledger UH 100 3c above stairs Top lift completed Install Toeboards UPY 200 14 and...

Страница 18: ...r anchors is given in PERI UP Flex Staircase 100 and 125 with Deck UDG Assembly Instructions for Standard Configuration Install anchors only in the levels which have been braced with Horizontal Braces...

Страница 19: ...Wall Ties UWT 140 or scaffold tube to the wall Fix Scaffold Tubes 18 to the Wall Ties UWT 140 or scaffold tube using Swivel Couplings 17 Fig A5 3a and Fig A5 4 At the intersection point of the diagona...

Страница 20: ...assembly sequence described in section A2 4 Remove highlighted Ledgers UH 200 3b and UH 100 3c Fig A6 2 Progressively move down by 1m Steel Decks UDG 200 9b on to Ledgers 100 3c once more Remove Ledg...

Страница 21: ...gressively remove the stair components repeating the detailed sequence in section A6 2 Remove Decks UDG 200 9b at the top of the stair flight and move down the other Decks UDG 200 9b Remove Ledgers UH...

Страница 22: ...10 progressively remove the stair components repeating the detailed sequence in section A6 2 Remove intermediate level UBK 250 200 10 l Reposition Steel Decks UDG 10 9b to position shown Fig A6 7 Remo...

Страница 23: ...ng for person self weight plus small tools in accordance with BS 5975 PERI recommend that the user displays clear signage indicating the permissible limits for personnel numbers thus Table 1 Tread wid...

Страница 24: ...that the user displays clear signage indicating the permissible limits for personnel numbers thus Table 2 Tread width 1 25m Tower height m Max Leg Load A Max Leg Load B Max Leg Load C Equiv No of pers...

Страница 25: ...asgow G21 2QA Tel 44 0 141 553 5252 4 0 Leeds Office Suite C Tuscany Way Wakefield Europort Normanton West Yorkshire WF6 2UA Tel 44 0 1924 899 848 5 0 Chepstow Riverside Court Beaufort Park Chepstow N...

Страница 26: ...UK e 01 2019 Copyright by PERI Ltd Peri Ltd Formwork Scaffolding Engineering Market Harborough Road Clifton upon Dunsmore Rugby CV23 0AN Tel 44 0 1788 861600 www peri ltd uk...