
A3 Assembling additional levels
A3.1 Vertical Standards UVR
PERI recommend using UVR 200 (
5a
) at
the additional levels.
Other combinations of standards (e.g. UVR
200 inside with UVR 300 outside) are
structurally acceptable, but the customer
must ensure safe method of erection &
striking.
Fix UBK 250/200 (
10
) to the uppermost
Rosette of 2 No UVR 200 (
5a
) shown as
pre-assembly.
Insert Vertical Standards UVR 200 (
5a
)
into the lower Standards UVR ensuring
alignment of the Ø11 holes.
10
A3.2 First level Ledgers UH and UBH
Fig.A3-2
All additional levels, except for the top level
repeat the following steps.
Fig.A3-1
Pre-assembly
Fig.A3-2a
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15
Fig.A3-2b
Attach UH Ledgers (
3b, 3c
) to the Rosett
on the Vertical Standards UVR (
5
), then
securely fix all wedges at UVB level using
a 500g hammer.
Place provisional Ledgers UH 100 (
3c
)
shown in red, it will be removed later.
Place Horizontal Brace UBH 250/200
(
12a
):
Attach hook in the round hole of the
rosette. (Fig. A3.2a)
On the opposite side of the Horizontal
Brace, unlock the lock and pull back the
slider. Attach the hook from below.
When pushing the slider forward, the
securing device drops down and holds the
Horizontal Brace UBH. (Fig. A3.2b)