A4 Assembling the top level
A4.3 Decks level
Reposition Steel Decks UDG 200 (
9b
) to
position shown.
Attach Stair Stringer UA (
6
) and UH 200
(
3b
). (Fig A4-4)
Install industrial deck UDG 100 (
9a
) onto
stair stringers UA.
Assemble Stair Steps repeating the
detailed sequence in section A2.5
A3.7 Guardrails
Attach UBK 250/200 (
10
) as intermediate
guardrails and remove temporary Ledger
UH 100 (
3c
) above stairs.
Top lift completed.
Install Toeboards UPY 200 (
14
) and
Toeboards UPY 100 (
13
) to all platforms if
required
A4.4 Stair Stringers. Steps and Stop
Fig.A4-4
Fig.A4-3
14