
A3 Assembling additional levels
A3.3 Second level Ledgers UH and
guardrails
Place Steel Decks UDG 200 (
9b
) on
Ledgers 100 (
3c
).
Attach UH Ledgers (
3b, 3c
) to the Rosette
on the Vertical Standards UVR (
5
), then
securely fix all wedges at UVB level using
a 500g hammer.
Place provisional Ledgers UH 100 (
3c
)
shown in red, they will be removed later.
Attach Horizontal Braces UBH 100/100
(
12b
) before next stage.
A3.4 H-Braces UBH
11
Fig.A3-4
Fig.A3-3
PERI UP Flex Staircase 100 and 125 with Deck UDG
Instructions for Assembly and Dismantling – Short lift system to SG4:15