![Peri CB 240 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/peri/cb-240/cb-240_instructions-for-assembly-and-use_1529930038.webp)
36
8
8
12.1
1
5.6
9.6
7
6
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
B1 Work on the Construction Site
Mounting of the CB 240
Finishing Platform
Finishing Tasks
If the safety cage is not used on the
ladder, then the guardrails on the fi-
nishing platform are to be mounted
up to the top or a safety net is to be
installed!
7. Lift the platform unit. The finishing
platform (8) pivots under the working
platform (1).
8. Attach anti-fall protection: guardrails
(12.1) and side protection for edge
platforms. (Fig. B1.26)
Alternative:
guardrails can also be mounted after
installing the platforms if suitable
safety measures are in place.
Fig. B1.29
Fig. B1.30
Fig. B1.31
11. Mount the missing Bolts M16 x 130
ISO 4014-8.8 with nuts and spring
washers (9.6) and tighten.
12. Mount wind bracing (6) and (7).
(Fig. B1.31)
13. Mount access ladder.
9. Mount climbing unit to the Scaffold
Mounting Rings M24 (5.6) of the
next climbing cycle.
10. Close the planking on the finishing
platform (8). (Fig. B1.30)
AuV CB 240 EX.indb 36
29.06.16 09:45