![Peri CB 240 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/peri/cb-240/cb-240_instructions-for-assembly-and-use_1529930032.webp)
30
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
B1 Work on the Construction Site
2.2
2
3.1
Anchoring
Important aspects when striking with
Anchor Positioning Stud M24:
Straighten out bent wire nails. When
retracting the formwork, the wire nails
(5.12) must be pulled through the ply-
wood.
(Fig. B1.13)
Fig. B1.15
Striking
If the formwork is retracted without
the use of the spindle, this could
r esult in damage to the carriage drive
unit.
Retracting
1. Release connections to the adjoining
elements (VKZ Couplings, BFD Align-
ment Coupler).
2. Release wedge (2.2) on the carriage.
3. Tilt formwork using Adjustable Brace
CB 164-225 (3.1). With this, the nails
from the Anchor Positioning Stud M24
(5.12) and box outs are pulled out of
the plywood or at least loosened.
4. Retract carriage (2). (Fig. B1.15)
Important aspects when striking with
Advancing Bolt M24:
Loosen and remove all Advancing Bolts
M24 (5.9) from the rear side of the ply-
wood. (Fig. B1.14)
5.12
5.9
Fig. B1.13
Fig. B1.14
AuV CB 240 EX.indb 30
29.06.16 09:44