![Peri CB 240 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/peri/cb-240/cb-240_instructions-for-assembly-and-use_1529930022.webp)
20
CB 240 Climbing Formwork
Instructions for Assembly and Use – Standard Configuration
A1 Assembly of the CB 240 Platforms
Assembly of Guardrails
Guardrail Post CB
1. Loosen bolt (1.6), SW 24, and take out
guardrail post (1.2). (Fig. A1.27)
2. Insert Guardrail Post into the holder.
The Crane Eye (1.4) is pointing in the
direction of the platform. Fix with bolt
(1.6), spring washer and nut.
(Fig. A1.28)
3. Proceed in the same way with the
second Guardrail Post.
Fig. A1.27
24 cm
16 cm
Fig. A1.28
Fig. A1.29
Depending on the height of the girders,
use the following:
24 cm = top drilled hole a
16 cm = bottom drilled hole b.
(Fig. A1.29)
a
b
Assembly of Guardrails
1. Cut guardrail boards (12.1) to match
platform width.
2. Attach guardrail boards to Guardrail
Post with screw clamps. Height:
50 cm and 100 cm above planking.
(Fig. A1.30a)
3. Fix guardrail boards and toe board
(12.2) with round head bolts M8 x 100
DIN 603 (12.5).
Pre-drill boards!
Guardrail boards flush with the planking.
Guardrail Post Extension CB (12.9)
It serves to extend the CB Guardrail
Post by 50 cm. Guardrail board and/or
scaffold tube connection. (Fig. A1.30b)
Fig. A1.30a
Fig. A1.30b
12.5
12.9
12.6
1.6
12.5
12.2
12.1
AuV CB 240 EX.indb 20
29.06.16 09:44