1/01 E Service Instructions
12
- Reducing the distance between
the pusher rod eyes moves up
the clamp on the right.
• Tighten clamping screws 1,
check for parallelism as described
above, and re-fit the paneling.
Machine Size 92 (Fig. 12):
Adjusting the clamp right-hand
side is analogue to that for ma-
chine size 76.
The clamp left-hand side must be
adjusted on clamp lever bearing
5 in Fig. 10. For this purpose,
proceed as follows:
• Slacken clamping screw 1 on
the front of the cross beam.
• Turn clamping lever pivot pin 2
from the machine back using key
surface 3.
• After checking for parallelism
with paper strips, tighten clamp-
ing screw 1.
Machine Sizes 115/132 (Fig. 14)
The clamping principle is shown
in Fig. 13.
• Remove the clamping system
front and rear paneling under the
cutting table.
• Slacken screw 1 on the front
lower cross beam.
• Gently turn clamping lever pivot
pin 2 or 3 by the key surface from
the back of the machine until the
paper strip, see above, is seized
by the clamp.
Only readjust that clamping lever
pivot pin where the deviation ex-
ists.
• Tighten screw 1 and re-fit the
paneling.
Fig. 12
Fig. 13
Fig. 14
3
1
2
2
3
1
3
2
Содержание 115 TV
Страница 5: ...1 01 E Service Instructions 5 Fig 2 ...