29
Wiring diagram - modules B and C:
T1
–
mixer 2 or 4 temperature sensor CT4, T2
–
mixer 3 or 5 temperature sensor CT4, T3
–
upper temperature sensor of the buffer, T4
–
lower temperature sensor of the buffer CT4, T5
–
reserve, RE
–
relay (12V, max 80mA) to
connect reserve boiler R, alarm AL, boiler shunt pump PP, or HUW circulating pump PC , T
–
room thermostat, R
–
reserve boiler, AL
–
alarm annunciator, PP
–
boiler shunt pump to
protect boiler return , PC
–
HUW circulating time, B
–
extension module (two heating
circuits, heat buffer, HUW circulating time), C (MX.03)
–
extension module (two additional
heating circuits), power supply cable, 230V AC , PM
–
mixer pump, SM
–
mixer servo, PC
–
HUW circulating time, * - HUW circulating pump available in module C from software
version
mod_A_v.01.31.21,
GR
–
ground
strip.
Содержание KSP Duo
Страница 1: ...Operation and maintenance manual for the boilers with feeder KSP Duo...
Страница 22: ......
Страница 23: ......
Страница 26: ......
Страница 31: ...REGULATOR INSTRUCTION MANUAL ecoMAX 910R1...
Страница 41: ...USER MANUAL OF CONTROLLER INSTALLATION AND SERVICE SETTINGS ecoMAX 910R1...
Страница 47: ...23...
Страница 71: ...47...
Страница 73: ...Quatro PSQ SCREW CONVEYOR FEEDER U S E R S MA N UA L Updated user s manual are available at www pereko pl...
Страница 82: ......
Страница 84: ...wer 13 12 2017 r...