![PERCo ST-01 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/perco/st-01/st-01_assembly-and-operation-manual_1528190038.webp)
ST-01 Speed gate, STD-01 Double-sided section
Install the additional equipment on the metal insert of the top cover.
Route the additional equipment connection cables through the central post to their connection
point.
Mount the central insert with additional equipment on its place, fix it with two M5×16 screws
using a SW4 Allen wrench. Tighten the screws preliminarily.
Adjust the top cover pieces relatively to the speed gate housing and to one another. Tighten
fully the top cover fixation screws.
Figure 24. Installation of the
STC-01GS
(
SDC-01GS
) section top cover
Do not work alone! During the installation pay attention to the gaps between the top cover and the
duct along the whole perimeter, repeat steps again, if necessary.
Remove the top cover in the reverse order.
Attention!
During long-term and intensive operation of the turnstile with built-in readers, scratches and
scuff marks can appear on the glass surface either from access cards presentation (as well
as from wallets, bags, wristbands, watches, rings, etc.) or from cleaning substances with
abrasive inclusion.
Such damages are not a warranty case.
In order to prevent or remove such damages manufacturer has provided self-adhesive
rubber pads for card presentation areas (see Fig. 25). Moreover, the customer can use the
services of special companies providing professional glass polishing or purchase new
covers for replacement from
PERCo
.
Figure 25. Gluing rubber cover on glass cover
37