Per-Eko KSW Скачать руководство пользователя страница 10

PER-EKO type KSW & KSW PLUS – Instruction Manual 

 

the sides of the boiler.  During a long-term use this can result in corrosion which decreases the lifespan of the boiler. 
Therefore, it is recommended to use the boiler above the temperature of 60˚C. This can be achieved by: 

 

Choosing the boiler according to the required size of utility rooms. 

 

Using tee or cross valves between  water outlet and inlet in the boiler. 

When starting the boiler for the first time or when starting the boiler from cold, a “boiler sweating” effect may 
occur, making it look like the boiler is leaking. In this case, the boiler is to be ignited intensely to the temperature 
of around 80˚C, in order to dry out the boiler and the convection channels. A similar procedure is to be applied 
once a week in cases when the boiler persistently operates in lower temperatures.  

 

5.4 Boiler malfunctioning 
 

Typical problems and solutions 

Problem 

Cause 

Solution 

insufficient chimney draught 

remove every leakiness in the 

chimney, the flue and the boiler door 

insufficient chimney height 

raise the chimney at least 1,5 m above 

the ridge 

excessively small chimney diameter 

adjust the flue throttle, decrease  

the airflow force 

very low atmospheric pressure 

apply a draught intensifying  

chimney fan 

Smoking on the outside 

pollution of the chimney ducts 

clean the ducts 

using a low calorific fuel 

change the fuel to a highly  

calorific one 

lack of air inflow to the boiler room 

allow the air inflow through a window 

or a ventilation duct 

controller or fan breakdown 

set the parameters once again 

according to the instruction manual or 

change to a new one 

Low heat efficiency of the boiler 

pollution of the fume ducts in the 

smoke tube chamber 

clean the ducts, adjust the throttle 

using wood as the main fuel 

use the fuel according to the 

instruction manual 

Humidity and excessive soot inside the 

boiler (symptoms similar to a leak) 

maintaining low temperature 

 in the boiler 

use the boiler in temperatures  

of at least 57˚C 

Leak 

to be assessed by the manufacturer 

Per-Eko service team repair 

 
 

5.5 Maintenance instruction 

 

Regular and meticulous cleaning of the boiler is essential for its appropriate functioning. When the deposit layer is 

too thick, the boiler looses its heat reception capabilities which results in lower efficiency and may lead to a breakdown. The 
boiler is to be cleaned at least once a week. The ash is to be thoroughly removed from the hearth chamber and the furnace. 
Once the upper and the lower inspection cover in the rear part of the boiler has been opened, both the smoke tubes and the 
fume ducts are to be cleaned and the soot is to be removed from the fume ducts.  
 

Periodical servicing is to be carried out once a year, when the boiler is in the stoppage mode. 

 

In order to perform the service and determine possible repairs, the boiler is to be thoroughly cleaned from all the 

remains which had been left in the burning process.  

Содержание KSW

Страница 1: ......

Страница 2: ... 3 BOILER EQUIPMENT 7 4 BOILER INSTALLATION MANUAL 7 4 1 Boiler set up 7 4 2 Boiler connection to the chimney 7 4 3 Supplementation of the boiler with central heating water 8 4 3 1 Information on terms and conditions enclosed in the PN 91 B 02413 norm 8 5 BOILER OPERATION MANUAL 8 5 1 Water filling 8 5 2 Ignition of the boiler 9 Boiler type KSW 9 Boiler type KSW PLUS 9 5 3 Burning fuels in the boi...

Страница 3: ...95 C The boilers belong to a group of low temperature boilers and are not subject to registration in the District Office of Technical Supervision The boilers are meant to operate in central heating water systems with gravitational or forced circulation in an open thermal cycle both having all the safety features in accordance with the requirements of the PN 91 B 02413 norms which relate to the sec...

Страница 4: ...10 Boiler water capcity dcm3 20 28 38 52 55 70 96 95 105 125 Heat exchanger material Steel P265GH PN EN 10028 thickness 5 mm Max working pressure MPa 0 15 Required min chimney draught Pa 20 23 25 28 35 Water temperature min max C 57 95 Voltage Power V W 230 85 Boiler weight excl water kg 113 125 160 174 186 220 270 305 331 380 Water supply pipe diameter cal G11 2 features only in PLUS version PN E...

Страница 5: ...hambers have got one door equipped with a flap which controls the air inflow 2 3 Flue The boiler has a welded flue which is responsible for transferring the fumes from the boiler to the environment The flue also has a smoke throttle responsible for controlling chimney draught 2 4 Insulation panels Located on the surface of the water main body the insulation panels limit the boiler s heat loss to t...

Страница 6: ...PER EKO type KSW KSW PLUS Instruction Manual 6 ...

Страница 7: ...boiler room should not be smaller than 1m The utility room in which the boiler is to be situated ought to have 2 air holes ventilation duct with a diameter not smaller than 50 of the chimney diameter surface efferent duct with a diameter not smaller than 140x140mm with an inlet hole under the ceiling of the boiler room 4 2 Boiler connection to the chimney The flue is to be attached to the chimney ...

Страница 8: ...ces The inner diameter of the safety pipe ought to be at least 25mm The inner diameter of the expansion pipe ought to be at least 25mm The safety pipe and the expansion pipes with the exception of vertical sections ought to be run without bends with a decrease of at least 1 towards the boiler changes in directions of pipes ought to be carried out using arcs with the axis radius of at least 2d wher...

Страница 9: ...n has started the system goes into the lighting mode This will activate the fan which will increase its operation gradually until finally reaching its preset working parameters these parameters are to be set according to the controller s instruction manual After reaching the temperature of 30 2 C the controller automatically activates the circulation pump In order to deactivate the controller a ST...

Страница 10: ...ange the fuel to a highly calorific one lack of air inflowto the boiler room allow the air inflow through a window or a ventilation duct controller or fan breakdown set the parameters once again according to the instruction manual or change to a new one Low heat efficiency of the boiler pollution of the fume ducts in the smoke tube chamber clean the ducts adjust the throttle using wood as the main...

Страница 11: ...n For the transportation purposes the boiler is placed on a wooden pallet and secured with plastic wrap 5 7 Final remarks The fundamental feature of the central heating boilers type KSW KSW PLUS is their construction which guarantees high efficiency with comparatively low fuel consumption The boilers are always accompanied with a warranty card which is to be demanded each time the boiler is purcha...

Страница 12: ...ler is subject to exchange once it has been declared by the factory that the boiler cannot be repaired The warranty card is the only document that allows the client to have the boiler repaired free of charge Quality complaints are to be declared in the nearest selling outlet or directly to the company using the address provided in the warranty card The warranty does not apply to draught regulator ...

Страница 13: ......

Страница 14: ......

Отзывы: