background image

TIMER OPERATION

Meter Immediate Control
A.meter.immediate.control.measures.water.usage.and.

regenerates.the.system.as.soon.as.the.calculated.system.

capacity.is.depleted..The.control.calculates.the.system.capacity.

by.dividing.the.unit.capacity.(typically.expressed.in.grains/unit.

volume).by.the.feedwater.hardness.and.subtracting.the.reserve..

Meter.Immediate.systems.generally.do.not.use.a.reserve.volume..

However,.in.twin.tank.systems.with.soft-water.regeneration,.

the.reserve.capacity.should.be.set.to.the.volume.of.water.used.

during.regeneration.to.prevent.hard.water.break-through..A.

Meter.Immediate.control.will.also.start.a.regeneration.cycle.at.

the.programmed.regeneration.time.if.a.number.of.days.equal.to.

the.regeneration.day.override.pass.before.water.usage.depletes.

the.calculated.system.capacity.

Meter Delayed Control
A.Meter.Delayed.Control.measures.water.usage.and.regenerates.

the.system.at.the.programmed.regeneration.time.after.the.

calculated.system.capacity.is.depleted..As.with.Meter.Immediate.

systems,.the.control.calculates.the.system.capacity.by.dividing.

the.unit.capacity.by.the.feedwater.hardness.and.subtracting.

the.reserve..The.reserve.should.be.set.to.insure.that.the.system.

delivers.treated.water.between.the.time.the.system.capacity.

is.depleted.and.the.actual.regeneration.time..A.Meter.Delayed.

control.will.also.start.a.regeneration.cycle.at.the.programmed.

regeneration.time.if.a.number.of.days.equal.to.the.regeneration.

day.override.pass.before.water.usage.depletes.the.calculated.

system.capacity.

Time Clock Delayed Control
A.Time.Clock.Delayed.Control.regenerates.the.system.on.a.timed.

interval..The.control.will.initiate.a.regeneration.cycle.at.the.

programmed.regeneration.time.when.the.number.of.days.since.

the.last.regeneration.equals.the.regeneration.day.override.value.

Day of the Week Control
This.control.regenerates.the.system.on.a.weekly.schedule..The.

schedule.is.defined.in.Master.Programming.by.setting.each.day.

to.either.“off”.or.“on.”.The.control.will.initiates.a.regeneration.

cycle.on.days.that.have.been.set.to.“on”.at.the.specified.

regeneration.time.

Control Operation During Regeneration 
During.regeneration,.the.control.displays.a.special.regeneration.

display..In.this.display,.the.control.shows.the.current.

regeneration.step.number.the.valve.is.advancing.to,.or.has.

reached,.and.the.time.remaining.in.that.step..The.step.number.

that.displays.flashes.until.the.valve.completes.driving.to.this.

regeneration.step.position..Once.all.regeneration.steps.are.

complete.the.valve.returns.to.service.and.resumes.normal.

operation.
Pressing.the.Extra.Cycle.button.during.a.regeneration.cycle.

immediately.advances.the.valve.to.the.next.cycle.step.position.

and.resumes.normal.step.timing.

Control Operation During Programming 
The.control.only.enters.the.Program.Mode.with.the.valve.in.

service..While.in.the.Program.Mode,.the.control.continues.

to.operate.normally.monitoring.water.usage.and.keeping.all.

displays.up.to.date..Control.programming.is.stored.in.memory.

permanently,.eliminating.the.need.for.battery.backup.power.

Manually Initiating a Regeneration
1.. When.timer.is.in.service,.press.the.Extra.Cycle.button.for.5.

seconds.on.the.main.screen.

2.. The.timer.advances.to.Regeneration.Cycle.Step.#1.

(backwash),.and.begins.programmed.time.count.down.

3.. Press.the.Extra.Cycle.button.once.to.advance.valve.to.

Regeneration.Cycle.Step.#2.(brine.draw.&.slow.rinse).

4.. Press.the.Extra.Cycle.button.once.to.advance.valve.to.

Regeneration.Cycle.Step.#3.(rapid.rinse).

5.. Press.the.Extra.Cycle.button.once.to.advance.valve.to.

Regeneration.Cycle.Step.#4.(brine.refill).

6.. Press.the.Extra.Cycle.button.once.more.to.advance.the.valve.

back.to.in.service.

NOTE:.. If.the.unit.is.a.filter.or.upflow,.the.cycle.step.order.

may.change.

NOTE:.. A.queued.regeneration.can.be.initiated.by.

pressing.the.Extra.Cycle.button..To.clear.a.queued.

regeneration,.press.the.Extra.Cycle.button.again.

to.cancel..If.regeneration.occurs.for.any.reason.

prior.to.the.delayed.regeneration.time,.the.manual.

regeneration.request.shall.be.cleared.

Control Operation During A Power Failure 
The.SXT.includes.integral.power.backup..In.the.event.of.power.

failure,.the.control.shifts.into.a.power-saving.mode..The.control.

stops.monitoring.water.usage,.and.the.display.and.motor.shut.

down,.but.it.continues.to.keep.track.of.the.time.and.day.for.a.

minimum.of.48.hours.
The.system.configuration.settings.are.stored.in.a.non-volatile.

memory.and.are.stored.indefinitely.with.or.without.line.power..

The.Time.of.Day.flashes.when.there.has.been.a.power.failure..

Press.any.button.to.stop.the.Time.of.Day.from.flashing.
If.power.fails.while.the.unit.is.in.regeneration,.the.control.will.

save.the.current.valve.position.before.it.shuts.down..When.power.

is.restored,.the.control.will.resume.the.regeneration.cycle.from.

the.point.where.power.failed..If.power.fails.during.a.regeneration.

cycle,.the.valve.will.remain.in.it’s.current.position.until.power.

is.restored..The.valve.system.should.include.all.required.safety.

components.to.prevent.overflows.resulting.from.a.power.failure.

during.regeneration..
The.control.will.not.start.a.new.regeneration.cycle.without.

line.power..If.the.valve.misses.a.scheduled.regeneration.due.

to.a.power.failure,.it.will.queue.a.regeneration..Once.power.is.

restored,.the.control.will.initiate.a.regeneration.cycle.the.next.

time.that.the.Time.of.Day.equals.the.programmed.regeneration.

time..Typically,.this.means.that.the.valve.will.regenerate.one.

day.after.it.was.originally.scheduled..If.the.treated.water.output.

is.important.and.power.interruptions.are.expected,.the.system.

should.be.setup.with.a.sufficient.reserve.capacity.to.compensate.

for.regeneration.delays.

 

Pentair.5600SXT.Softener.System..•..9

Содержание 5600SXT Series

Страница 1: ...5600SXT SOFTENER SYSTEM OPERATOR S MANUAL VT 11 01 VT 17 01 VT 23 01 2018 Pentair Residential Filtration LLC waterpurification pentair com...

Страница 2: ...son installing this equipment should have Knowledge in the water softener installation Basic plumbing skills Icons That Appear In This Manual WARNING Failure to follow this instruction can result in p...

Страница 3: ...bing first Connect to valve last Plastic parts and O rings may be damaged by heat and solvents When constructing plumbing connections allow heated parts to cool and protect parts from solvents System...

Страница 4: ...ystem is shipped with several parts unassembled When parts are removed from the packing they should be inspected for damage If any parts are damaged or missing contact your supplier WARNING When handl...

Страница 5: ...Figure 1 Standard Basement Before Installation Cold Water Lines Shown Soft Water Hard Water Outside Faucet Outside Faucet Bath Tub Lavatory Toilet Kitchen Laundry Tubs Pump or Meter Hot Water Outlet W...

Страница 6: ...Take the drawing to your plumbing supply store Consult with their expert for installation ideas and suggestions Assemble the plumbing WARNING If pipes will be sweat soldered do not connect adapters t...

Страница 7: ...the valve Make certain the connections are hand tightened Be sure that the salt line is secure and free from air leaks Even a small leak may cause the salt line to drain out and the softener will not...

Страница 8: ...er failure but it does store the volume remaining at the time of power failure Settings for both valve basic system and control type method used to trigger a regeneration Day of the Week controls Whil...

Страница 9: ...ation During Programming The control only enters the Program Mode with the valve in service While in the Program Mode the control continues to operate normally monitoring water usage and keeping all d...

Страница 10: ...NOT set to 12 01 PM 2 Use this display to adjust the Day Override This option setting is identified by DO in the upper left hand corner of the screen 3 Press the Extra Cycle button Use this display t...

Страница 11: ...ity Fixed volume to be used as a reserve DO Day Override The system s day override setting RT Regen Time The time of day the system will regenerate BW BD RR BF Regen Cycle Step Times The time duration...

Страница 12: ...selected in Master Programming Mode 1 Display Format Display Code DF This is the first screen that appears when entering Master Programming Mode The Display Format setting specifies the unit of measu...

Страница 13: ...he control type has been set to one of the metered options There are two possible settings FS Safety Factor rc Fixed Reserve Capacity 9 Safety Factor Display Code SF Press the Extra Cycle button Use t...

Страница 14: ...er of the display Set the value to ON to schedule a regeneration or OFF to skip regeneration for each day Use the Up and Down buttons to adjust the setting as needed Press the Extra Cycle button to ac...

Страница 15: ...in service 2 Use this display to view the current Flow Rate This option setting is identified by FR in the upper left hand corner of the screen 3 Press the Up button Use this display to view the Peak...

Страница 16: ...softeners A Backwash the softener and add the required amount of hypochlorite to the well of the salt tank The salt tank should have water in it to permit the chlorine solution to be carried into the...

Страница 17: ...0661 Injector Assembly 0 use with 3 5 DLFC 12 x 54 CONTROL VALVE ASSEMBLY 61500 56SE Rev A 4 1 12090 DLFC Washer 3 5 gpm 12 x 52 12087 DLFC Washer 2 0 gpm 9 x 48 12088 DLFC Washer 2 4 gpm 10 x 54 5 1...

Страница 18: ...x 52 2 0 ft3 CH20676 ReplacementMedia Resin 9x48 1 0ft3 CH20676 ReplacementMedia Resin 10x54 1 5ft3 3 1 4005297 Riser Tube Assembly 12 x 52 4001870 Riser Tube Assembly 9x48 4001980 Riser Tube Assembl...

Страница 19: ...WELL ASSEMBLY Item No QTY Part No Description 1 1 CH34393 1 1434 BLK BRN TK DRILLED CVR DRILL FOR CH15676 2 1 CH15676 Brine Well w Brine Tube Fittings 18 x 40 Round 1 2 Pentair 5600SXT Softener Syste...

Страница 20: ...1 VALVE POWERHEAD ASSEMBLY Item No QTY Part No Description 1 1 40251 Motor SXT Valves 61501 56SXT Rev C 20 Pentair 5600SXT Softener System...

Страница 21: ...ine Air in water system Assure that well system has proper air eliminator control Check for dry well condition Improperly sized drain line flow control Check for proper drain rate Iron in conditioned...

Страница 22: ...nd verify that it functions correctly If the error reoccurs unplug the unit and contact technical support 2 Regen Failure The system has not regenerated for more than 99 days or 7 days if the Control...

Страница 23: ...Number 17438 Service Position 1 Backwash Position 2 Brine Slow Rinse Position 3 Rapid Rinse Position 4 Brine Tank Fill Position Service Position Service Position Backwash Position Brine Slow Rinse Po...

Страница 24: ...WIRING DIAGRAM 24 Pentair 5600SXT Softener System...

Страница 25: ...ly to assure proper function Make sure control valve is returned to the In Service position 11 Be sure there is enough salt in the brine tank 12 Start regeneration cycle manually if water is hard Time...

Страница 26: ...conditioner NOTE Be sure to shut off any bypass line 8 Replace the control valve back cover 9 Follow Injectors Screen Replacement steps 9 12 Meter Replacement To replace meter refer to Replacing Brin...

Страница 27: ...uring Regeneration gpm 2 0 2 4 3 5 General Technologies C108DQ Na 8 cross linked ion exchange resin cu ft 1 0 1 5 2 0 Tank Size 9 x 48 10 x 54 12 x 52 Backwash gpm 2 0 2 4 3 5 Rapid Rinse Purge gpm 2...

Страница 28: ...rks and logos are owned by Pentair plc or its affiliates Third party registered and unregistered trademarks and logos are property of their respective owners 13845 BISHOPS DR SUITE 200 BROOKFIELD WI 5...

Отзывы: