8
IntelliChlor Electronic Chlorine Generator COMSYS-10 Installation Guide
PRIMARY SECONDARY SECONDARY
Terminal Screw
Connector
CPC203
CPC103
SECONDARY SECONDARY
Power Centers
The PRIMARY and SECONDARY power centers have been pre-wired with communication wires as shown
below.
Power Centers (Front View)
Power Center
communication wire
connection