background image

4

IntelliChlor Electronic Chlorine Generator COMSYS-10 Installation Guide

Connect these
wires to ORP

PRIMARY         SECONDARY     SECONDARY

Connect these
wires to AC
power source

Connect AC Power Wires and ORP Sensor Wires 

(Continued)

4. Splice the incoming AC power wires onto the two wires labeled WIRED FOR 220V.  Do not

apply AC power yet.

5. Connect the two (2) twisted wires labeled ORP SENSOR to the ORP chlorine controller panel

(AcuTrol, etc., not included in kit). Carefully place the connection inside of power center.

6. Replace the cover on the upper Primary power center and lower Secondary power center.

Secure each cover with the retaining screw.

PRIMARY     Secondary     Secondary

Secondary     Secondary

CPC103

CPC202

CPC103

Splice in junction box

(see STEP 4)

Communication

wires

Содержание 520974

Страница 1: ...IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS INTELLICHLOR SALT CHLORINATOR COMMERCIAL SYSTEM COMSYS 10 P N 520974 INSTALLATION GUIDE...

Страница 2: ...hours Comsys 10 5 cell 1 primary and 4 secondary produces ten pounds of chlorine per day The ORP system not provided is a separate device that monitors the available chlorine in the water and when ne...

Страница 3: ...E PROCEEDING IMPORTANT SAFETY PRECAUTIONS PLEASE READ THE FOLLOWING Read all the safety precautions in this manual before attempting any electrical wiring Be sure to read and follow all safety Instruc...

Страница 4: ...REAKER to the junction box Note ThisAC power should be on its own breaker for future servicing Note For 110VAC operations each power center will need to be re configured A 110VAC wiring diagram is pro...

Страница 5: ...abeled WIRED FOR 220V Do not applyAC power yet 5 Connect the two 2 twisted wires labeled ORP SENSOR to the ORP chlorine controller panel AcuTrol etc not included in kit Carefully place the connection...

Страница 6: ...t the two wires from the CPC202 into terminal block in same order as the wires already connected Be sure to match the wire colors GREEN to GREEN and YELLOW to YELLOW 10 Replace the cover on the upper...

Страница 7: ...and the buttons can be pressed if needed CAUTION Do not install upside down 4 Verify water flow direction See the FLOW arrow located on the IntelliChlor cell near the input coupling IMPORTANT MANIFOL...

Страница 8: ...r on the receptacle turn it slowly until the plug pins are inserted into the receptacle then twist it to lock it in place 2 Plug the four SECONDARY cell power connectors into each of the power centers...

Страница 9: ...de PRIMARY SECONDARY SECONDARY Terminal Screw Connector CPC203 CPC103 SECONDARY SECONDARY Power Centers The PRIMARY and SECONDARYpower centers have been pre wired with communication wires as shown bel...

Страница 10: ...is flashing the cell has become dirty and requires acid cleaning Turn off the circuit breaker to the power centers disable water flow through the manifold either an external valve or turn off the filt...

Страница 11: ...h salt is in the water to produce chlorine cell is OFF 1 Add salt to the water and bring up to 3600ppm Allow it to mix for 24 hours 2 The salt level will be checked every 8 hours by the cells and disp...

Страница 12: ...ion in order to minimize the corrosion and deterioration that is inherent in and around salt water pools PENTAIR WATER POOL AND SPA INC 1620 HAWKINS AVE SANFORD NC 27330 919 566 8000 10951 WEST LOS AN...