![Pentair 3200NXT Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/pentair/3200nxt/3200nxt_service-manual_1524505003.webp)
Please Circle and/or Fill in the Appropriate Data for Future Reference:
Programming Mode:
Feed Water Hardness: __________ Grains per Gallon or Degrees
Regeneration Time: Delayed __________ AM/PM or __________ Immediate
Regeneration Day Override: Off or Every __________ Days
Time of Day: __________
Master Programming Mode:
Valve Type: 2750 / 2850 / 2900s / 3150 / 3900 / Stager
Regenerant Flow: Downflow / Upflow Brine Draw First / Upflow Brine Fill First
Valve Address: #1 / #2 / #3 / #4
Display Format: US Gallons or m
3
Unit Capacity: __________ Grains or Degrees
Capacity Safety Factor: Zero or __________ %
Feed Water Hardness: __________ Grains or Degrees
System Size: 1 Valve / 2 Valves / 3 Valves / 4 Valves
Regeneration Cycle Step #1: _ _ : _ _ : _ _
Regeneration Cycle Step #2: _ _ : _ _ : _ _
Regeneration Cycle Step #3: _ _ : _ _ : _ _
Regeneration Cycle Step #4: _ _ : _ _ : _ _
Regeneration Cycle Step #5: _ _ : _ _ : _ _
Timed Auxiliary Relay Output Window:
Off or Start Time _ _ : _ _ : _ _
End Time _ _ : _ _ : _ _
Chemical Pump Output Auxiliary Relay: Off or Volume (Gallons or M
3
)
Time: _ _ : _ _ : _ _
Fleck Flow Meter Size: Paddle: 1” 1.5” 2” 3”
Turbine: 1” 1.5”
Generic Flow Meter: Maximum Flow Rate:
Add _ _ _ Gallons every _ _ _ Pulses
Page 3
Job Specification Sheet
Содержание 3200NXT
Страница 1: ...3200NXT Service Manual IMPORTANT Fill in Pertinent Information on Page 3 for Future Reference...
Страница 25: ...Page 25 Notes...
Страница 30: ...Page 30 2750 2850 3150 Input Output Wiring...
Страница 31: ...Page 31 2900 3900 Input Output Wiring...
Страница 34: ...Page 34 Notes...
Страница 35: ...Page 35 Notes...
Страница 36: ...P N 42599 Rev C 4 09...