![PENSOTTI PNCC-32N Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/pensotti/pncc-32n/pncc-32n_instruction-manual_1524149038.webp)
INSTALLATION INSTRUCTIONS
35
Vertical Installation:
If the vent pipe is to pass through a cold attic space. Vent
pipe MUST be insulated with the proper insulation
material.
1. Install Appliance.
Determine where
your appliance will be installed and follow
the Appliance manufacturer’s installation
instructions accordingly.
2. Determine the location of your ceiling
and/or roof penetration.
Avoid cutting floor or
roof supporting members. Always make sure
to follow the appliance manufacturer’s required
minimum clearance to combustibles.
3. Cut and frame floor penetration
openings.
Cut and frame 7-
1/2” x 7-1/2”
openings at each floor level through which
the CVS vent system will penetrate. The
opening at the roof does not require framing.
Vertical installations of the CVS vent need to
be supported. A Firestop Support is required
where the
vent system passes through the first
floor, and additional Firestops are required at
each floor opening, except the roof. Follow
the appliance manufacturer’s requirements for
minimum clearance to combustibles
4. Install Firestop Support(s).
At each framed
floor opening, install a Firestop Support. The
Firestop Support is listed to support up to 40-ft
of CVS vent pipe. The Firestop Support is
installed from underneath the opening, held in
place by (4) 1-
1/2” wood screws in the corners
(Fig 6). From the other side, extend the straps
of the Firestop Support and secure them to
nearby framing members with additional 1-
1/2”
wood screws. As the vent passes through the
Firestop Support, install the clamp around the
vent and tighten withthe screws provided, so the weight of
the vent is supported by the
Firestop Support
(Fig 6)
.
Содержание PNCC-32N
Страница 8: ...GENERAL INFORMATION 5 ...
Страница 9: ...GENERAL INFORMATION 6 ...
Страница 10: ...GENERAL INFORMATION 7 ...
Страница 11: ...GENERAL INFORMATION 8 ...
Страница 14: ...INSTALLATION INSTRUCTIONS 11 2 2 Dimensions ...
Страница 15: ...INSTALLATION INSTRUCTIONS 12 2 3 Internal parts of the boiler ...
Страница 16: ...INSTALLATION INSTRUCTIONS 13 2 5 Water circuit ...
Страница 17: ...INSTALLATION INSTRUCTIONS 14 2 5 Circulation pump head flow graph ...
Страница 35: ...INSTALLATION INSTRUCTIONS 32 ...
Страница 41: ...INSTALLATION INSTRUCTIONS 38 36 ...
Страница 43: ...INSTALLATION INSTRUCTIONS 40 ...
Страница 45: ...INSTALLATION INSTRUCTIONS 42 ...
Страница 71: ...MAINTENANCE INSTRUCTIONS 68 6 6 Wiring diagrams DIGITECH TR Printed Circuit Board MIAH403 110 V 60 hz ...
Страница 76: ...MAINTENANCE INSTRUCTIONS 73 6 10 Exploded Drawings ...
Страница 77: ...MAINTENANCE INSTRUCTIONS 74 ...
Страница 78: ...MAINTENANCE INSTRUCTIONS 75 ...
Страница 79: ...MAINTENANCE INSTRUCTIONS 76 ...
Страница 81: ...Pensotti LLC 34 Coffin Ave Brewer ME 04412 P 207 942 3636 F 207 942 3737 www pensottiboiler com ...