![Pelton & Crane Solaris 2 10'-SSC120-2-L Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/pelton-and-crane/solaris-2-10-ssc120-2-l/solaris-2-10-ssc120-2-l_installation-manual_1523575008.webp)
8
1. Remove sink base module, and partitions from their
packaging. remove hardware
2. Remove doors and drawers from cabinets taking care to
store doors in a manner in which all can go back in their
original positions. The hinges installed are snap-on/off and
can easily be removed by pulling the tab marked "pull" lo-
cated at the back end of the hinge base plate. Hold door
securely when disengaging from the hinge. The door will
come loose quickly when the tab is pulled.
Note: False floors are located inside some of the base
cabinets. These false floors can be removed as the in-
dividual bases are installed.
NOTE: These installation instructions describe the procedures with the technician facing the front of the
cabinet.
Pull
Tab
WARNING:
Be sure the main power is turned
off at the installation site.
WARNING:
Do not lift cabinets by their
countertops.
3. Remove false floors from the lower modules.
.
4. Position sink cabinet base over the sink plumbing stub ups or stub outs.
5. Level the module by turning the leveling feet. Turn the
leveling feet clockwise to lower and counterclockwise
to raise the cabinet. Ensure all modules are level across the top
and that all of the leveling feet are making.
contact with the floor.
CABINET BASES AND PARTITION INSTALLATION
from Sterilization Tower.
If no Steri Tower was ordered, hardware will be on
sink module or with upper cabinets.
1.013.2466 R00
Zach Rules!
For drawer release
see QR code above
(page 10 of Dynapro catalog)
If you have upgraded
to lift doors, do NOT remove
them.