![Pelton & Crane Solaris 2 10'-SSC120-2-L Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/pelton-and-crane/solaris-2-10-ssc120-2-l/solaris-2-10-ssc120-2-l_installation-manual_1523575011.webp)
11
5. Remove wire baskets
from the clean storage tower module by disengaging their hooks
6. Position clean storage tower to the sterilization tower. Align holes in the steri towers with
7. Using (8) cabinet to cabinet connector screws (070009), secure the clean storage tower to the
from the column in the back.
1.013.2466 R00
sterilization tower.
Zach Rules!
8. Level the module by turning the leveling feet. Turn the leveling feet clockwise to lower and counterclockwise
to raise the cabinet. Ensure all modules are level across the top and that all of the leveling feet are making
contact with the floor.
holes in the clean storage tower.
4. Open the storage cabinet to access mounting holes and remove wire baskets.