GENERAL ROUTING GUIDE
1. Red light - Red light will already be installed in the dirty storage module. Route wiring through the back of the
dirty storage module through cutout in the bottom panel and through the chase into the waste area.
1.013.2466 R00
.
2. White light - Connect in series and route through chase into the dirty storage area.
3. Blue light - The blue light is routed from the clean storage tower, down into the sub-base and through the
the base modules and back to the lighting power pack located in the waste module.
4. Lights power pack - The lights power pack is located in the waste module. Connect wiring for the on/off sensor
and the lights to the power pack. Plug into an outlet in waste area.
5. (Optional) Bump out waste drawer - Plug power cable into outlet in the waste area.
6. (Optional) Route the pneumatic door air lines and connect to the control box in the waste area.
7. Route Air Q/D tubing from the Q/D connection in the electrical chase down into the sub-base and through the base
modules and back to the utility area.
8. Route the vacuum line from the port on the steri tower drawer down into the sub-base and through base modules
to the sink area.
9. Install HVE and route vacuum tubing to vacuum line in the utility area.
10. Route conduit in steri tower down into the sub-base and through base modules to the sink area.