Fastening Door to Opening
I.
After setting the door plumb level & square,
secure the door to the opening. If using
frame screw method then have two people hold the door upright and secure while a
WKLUGSHUVRQRSHQVRQHSDQHODQGLQVHUWVDVFUHZWKURXJKWKHMDPEGRZQIURPWKHWRS
corner, then open the other panel and repeat on the opposite jamb. See below for pilot
KROHVFUHZVL]H ORFDWLRQGHWDLOV
6"
16" MAX
O.C.
16" MAX
O.C.
16" MAX
O.C.
16" MAX
O.C.
6"
6"
6"
6"
6"
6"
6"
DOUBLE OPERABLE
6"
6"
16"
MAX.
O.C.
3P
6"
6"
16"
MAX.
O.C.
3P
3P
3P
16" MAX
O.C.
16" MAX
O.C.
6"
6"
6"
6"
SINGLE FIXED OR OPERABLE
6"
6"
16"
MAX.
O.C.
6"
6"
16"
MAX.
O.C.
6"
6"
16"
MAX.
O.C.
6"
6"
16"
MAX.
O.C.
16" MAX
O.C.
6"
6"
3"
3"
6"
6"
16" MAX
O.C.
6"
6"
3"
3"
6"
6"
3P
3P
ALTERNATE ANCHORING METHODS, CLIP AND SCREW PLACEMENT:
5I
5I
5I
5I
5I
5I
Vent Placement
Fixed Placement
Fixed and Vent
Placement
Vent Placement
Vent Placement
Fixed Placement
Fixed Placement
Out-Swing Screw Locations
In-Swing Screw Locations
5
DOOR REPLACEMENT IN SIDING
WITHOUT NAIL FIN (continued):