background image

5

DOOR REPLACEMENT IN SIDING  

WITHOUT NAIL FIN (continued):

D. 

Clean the vinyl j-channel/trim and rough opening

 with isopropyl alcohol or 

window cleaner to make sure it is free of dirt and debris before proceeding.

E. 

Place a 3/8" bead of sealant

 (or enough to cover 

the area) between the j-channel and the rough 
opening at the head and jambs only. Tool the 
sealant with a putty knife to press the sealant into 
the opening.

CAUTION:  The cut fin may have sharp edges!

'-"4)*/(5"1&

1-"$&.&/5(6*%&

4*--5"1&4

)&"%5"1&

+".#5"1&4

F. 

Place a 3/8" bead of sealant

 at each corner of 

the opening.

PRESS

SEALANT

INTO 

OPENING

HEAD

AND

JAMBS

ONLY

2B

2C

5E

5F

*

Starting at the top (head) of the opening,

 cut 

RQHSLHFHRIŶDVKLQJWDSHORQJHUWKDQWKH

width of the rough opening. Place the flashing 
tape onto the j-channel edge, over the sealant 

DQGRQWRWKHURXJKRSHQLQJVXUIDFHDQGH[WHQG
GRZQWKHMDPEV

H. 

Cut two pieces of flashing 
tape 6" longer than the height 
of the opening.

 On one side 

(jamb) of the opening, start the 
tape in the upper corner and 
work down and onto the sill. 

0DNHVXUHWKHWDSHLVDSSOLHG

from the j-channel edge over 
the sealant and onto the rough 
opening surface.

%

5G

For Sill Preparation see steps 1E - 1T.

5H

See steps 3A - 3F only for Setting the Door.

Содержание 81DU0100

Страница 1: ...ional Check with the individual building owner architect contractor installer and or consumer responsible for the project in addition to local building code of cials to determine if these products com...

Страница 2: ...VFUHZV FRUURVLRQ UHVLVWDQW VFUHZV RU PDVRQU VFUHZV 7DSH PHDVXUH HYHO 6TXDUH DPPHU 6WDSOHU 6HDODQW XQ 6FLVVRUV RU XWLOLW NQLIH 7LQ 6QLSV 6FUHZGULYHUV 3KLOOLSV ZLWK VKDIW and small flat blade 7 7RU UHQF...

Страница 3: ...LGWK SSO DW WKH ERWWRP RYHUODSSLQJ WDSH E DW OHDVW 2 127 DOORZ WKH WDSH WR H WHQG SDVW WKH LQWHULRU IDFH RI WKH IUDPLQJ In swing doors I WKH ZDOO GHSWK LV JUHDWHU WKDQ DGG D WKLUG SLHFH RI DVKLQJ WDSH...

Страница 4: ...liding into place XQWLO WKH H WHULRU VLOO SDQ OLS LV XVK ZLWK WKH H WHULRU RI WKH URXJK opening N Apply sill ashing tape Cut a SLHFH RI DVKLQJ WDSH ORQJHU than the opening width Apply at the bottom of...

Страница 5: ...om door Do not remove plastic shipping spacers The shipping spacers will help keep the door square during installation Do not open the door until it is fully fastened Note If grilles or hardware are r...

Страница 6: ...OT slide the bottom of the door into the opening Sliding will damage the sealant lines Place the bottom of the door at the bottom of the opening then tilt the top into position Center the door between...

Страница 7: ...alant in each RI WKH SUH GULOOHG KROHV LQ WKH ERWWRP RI WKH XQLW VLOO 7KHQ LQVHUW D FRUURVLRQ UHVLVWDQW VFUHZ SURYLGHG LQWR HDFK KROH RU PDVRQU RRUV XV D PDVRQU VFUHZ LQ SODFH RI WKH SURYLGHG VFUHZ SL...

Страница 8: ...framing N Check door operation Open and close the door to check for SURSHU RSHUDWLRQ 0DNH VXUH WKH GRRU ZLOO ODWFK FRUUHFWO Note If there are any problems with the operation check to con rm the door...

Страница 9: ...VV WDSH DW WKH WRS DQG ERWWRP RI WKH GRRU P Doors with a lock strike in the side jamb and without a sidelight on the lock side ULOO DQ GLDPHWHU GHHS SLORW KROH LQWR WKH URXJK RSHQLQJ WKURXJK WKH SUH G...

Страница 10: ...sill ashing paper overlaps the building felt This will tie the door system into the building water management system As required by local code such as Florida product approval system additional anchor...

Страница 11: ...of sealant at each corner of the opening PRESS SEALANT INTO OPENING HEAD AND JAMBS ONLY 2B 2C 5E 5F Starting at the top head of the opening cut RQH SLHFH RI DVKLQJ WDSH ORQJHU WKDQ WKH width of the r...

Страница 12: ...WDLOV 6 16 MAX O C 16 MAX O C 16 MAX O C 16 MAX O C 6 6 6 6 6 6 6 DOUBLE OPERABLE 6 6 16 MAX O C 3P 6 6 16 MAX O C 3P 3P 3P 16 MAX O C 16 MAX O C 6 6 6 6 SINGLE FIXED OR OPERABLE 6 6 16 MAX O C 6 6 16...

Страница 13: ...the weatherstrip 5F 5P K Frame Head ULOO DQG FRXQWHU VLQN GLDPHWHU FOHDUDQFH KROHV WKURXJK WKH GRRU frame head only and not into the rough opening at the locations shown on the diagrams L Threshold UL...

Страница 14: ...UR LPDWHO SDVW WKH HGJH RI WKH IUDPH DQG SDVW WKH MDPE H WHQVLRQV DQG DSSO D GHHS EHDG RI IRDP 7KLV ZLOO DOORZ URRP IRU H SDQVLRQ RI WKH IRDP DQG ZLOO PLQLPL H VTXHH H RXW SSO VHDODQW DFURVV WKH LQWHU...

Страница 15: ...e Backer Rod and Sealant typical Perimeter Sealant must extend to roomside of Accessory Groove Accessory Groove Insulating Foam 3 8 Min 3 8 Insulating Foam Perimeter Sealant must extend to room side o...

Страница 16: ...ly a bead of high quality exterior grade sealant to the entire perimeter of the door C Shape tool and clean excess sealant When nished the sealant should be the shape of an hourglass D Remove plastic...

Страница 17: ...nting Clean this surface with mild soap and water DO NOT use abrasives DO NOT scrape or use tools that might damage the surface Panel Cleaning and Prep Instructions for Un nished or Primed Panels Dry...

Страница 18: ...nance failure to install Pella products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within the...

Страница 19: ...FE JO TTVF Issue 2 Door needs to close more tightly against the weather strip Remove the strike and adjustable strike shim Remove the tabs from the adjustable strike shim and install so that the thick...

Отзывы: