Construct a sill pan for the door.

 Measure the rough opening width and add 2". Measure 

1" up from each end and cut through the vertical leg of the pan material. If there is a step 
down at the exterior of the door opening, make the sill pan depth equal to the door frame 
depth - 2-1/8". If there is NO step down, make the sill pan depth equal to the frame depth. 
Bend the bottom (side) flaps of the pan material up, then bend the back leg around the 
end of the pan.  

Dry fit the sill pan and the door

 into the opening.

J. 

If there is a step down at the exterior of the door opening,

 cut the sill nosing to the 

rough opening width plus two times the flange width. Notch the sill nosing. If there is 
NO step down, skip to step K.

i

'PME

VQ

FOE

$VU

IFSF

4JMMQBO

EFQUI

'PME

JOUBC

$0/4536$5"%0034*--1"/

3&1&"545&14'0301104*5&&/%

4JMM/PTJOH

306()01&/*/(8*%5)

'-"/(&

8*%5)

'-"/(&

8*%5)

2J

Note: If the new door frame is deeper than the existing door frame, it will be necessary 
to cut the interior flooring material back to allow the door flush flanges to contact the 
existing aluminum door frame.

2

 

OPENING PREPARATION (CONTINUED)

Содержание 81CM0100

Страница 1: ...d additional care Determining the appropriate installation method is the responsibility of you your architect or construction professional If you have questions please contact your local Pella retaile...

Страница 2: ...asure Level Sealant gun Square Hammer Screwdriver Utility knife Wide jaw pliers Reciprocating saw 1 8 and 1 4 drill bit Drill 4 5 4 5 Installation will require two or more persons for safety reasons 1...

Страница 3: ...ealant and other debris from the door opening 2B NOTE 2B 2B 2A F If the weep holes of the existing sill have been cut away drill new weep holes in the existing door jambs Be sure to drill weep holes i...

Страница 4: ...ound the end of the pan Dry t the sill pan and the door into the opening J If there is a step down at the exterior of the door opening cut the sill nosing to the rough opening width plus two times the...

Страница 5: ...2L M If using sill nosing with a step down Install the sill pan and sill nosing into the opening Press down to seal them into the opening DO NOT overlap N Apply sealant at nosing ends continuing from...

Страница 6: ...B Remove the shipping spacers Carefully slide the movable panel halfway open and remove the spacers from both the top and bottom of the movable panel C Remove the venting panel by lifting it off of th...

Страница 7: ...o the opening and that the door anges will overlap the stucco or existing aluminum door frame by a minimum of 1 2 on all sides REMOVE THE DOOR FROM THE OPENING D Place three 3 8 beads of sealant Place...

Страница 8: ...Note If the dimensions are not equal check to make sure the ns are folded out to 90 at all points K Secure the frame Insert a 1 wide shim behind the pilot hole at the lock strike s Insert a 8 x 2 1 2...

Страница 9: ...corrosion resistant wood screws through the holes in the threshold in to the oor Note For concrete oors use masonry screws a minimum size of 3 16 x 3 1 2 4N L Apply sealant and insert a 8 x 2 1 2 pan...

Страница 10: ...he exterior of the building tilt the top of the panel toward the door frame and insert the top of the door panel into the top track Move the bottom of the panel toward the door frame until it is verti...

Страница 11: ...ion of the foam and will minimize squeeze out Apply sealant across the interior surface of shims to create a continuous seal For doors with jamb extensions installed ensure the foam is placed between...

Страница 12: ...urface Clad Exterior Frame The exterior frame is protected by aluminum cladding with our tough EnduraClad baked an factory nish that needs no painting Clean this surface with mild soap and water DO NO...

Страница 13: ...ruction must anticipate some water in ltration it is important that the wall system be designed and constructed to properly manage moisture Pella Corporation is not responsible for claims or damages c...

Отзывы: